请达人将以下合同条款(1,2,3,4)翻译成英文,翻译的好,会额外加分!

第十三条双方确定,按以下标准及方法对乙方完成的研究开发成果进行验收:Article13Confirmedbybothsides,PartyAshalladoptthefo... 第十三条 双方确定,按以下标准及方法对乙方完成的研究开发成果进行验收:
Article 13 Confirmed by both sides, Party A shall adopt the following standards and methods to examine and accept the R&D result accomplished by Party B

1. 以甲方可以通过浏览器运行为验收标准;

2. 验收期内修改和调整包括文本内容正误调整、校对(以甲方提供的材料为标准)、界面处理大小更改等。修改内容在合同规定工作量内不收取额外费用,如有增加页面、功能等,按增加后的实际费用收费。

3. 甲方以书面方式确定是否验收合格。

4. 甲方验收期限为站点建设全部完成后的 两 个工作日内,逾期不验收的,视为乙方的工作成果符合合同规定,并推断为验收合格通过。
谢绝使用工具或软件翻译 在线翻译等!
展开
 我来答
andychewbj
2011-03-01 · TA获得超过5.9万个赞
知道大有可为答主
回答量:3.2万
采纳率:90%
帮助的人:1.2亿
展开全部
1. 以甲方可以通过浏览器运行为验收标准;
1. The acceptance standard shall be that the website can be run by Party A through a browser;

2. 验收期内修改和调整包括文本内容正误调整、校对(以甲方提供的材料为标准)、界面处理大小更改等。修改内容在合同规定工作量内不收取额外费用,如有增加页面、功能等,按增加后的实际费用收费。
2. During the acceptance period, modifications and adjustments including the correction of text, proofreading (based on the materials provided by Party A as the standard) , size alteration and interface processing shall be conducted. No extra charges shall be levied if the modification workload is within the specified scope in the contract; fees for the addition of web pages and functions etc. shall be charged according to actual expenses after they are completed.

3. 甲方以书面方式确定是否验收合格。
3. Party A shall verify the official acceptance in writing.

4. 甲方验收期限为站点建设全部完成后的 两 个工作日内,逾期不验收的,视为乙方的工作成果符合合同规定,并推断为验收合格通过。
4. The time limit for acceptance by Party A shall be 2 working days after the full completion of the web site construction. In the event that acceptance test is not conducted within the time limit, the work result of Party B shall be construed as conforming to contract specifications and shall be considered passing the acceptance test.

【英语牛人团】
百度网友3892afd
2011-02-26 · TA获得超过780个赞
知道小有建树答主
回答量:240
采纳率:100%
帮助的人:117万
展开全部
1 party a can be launched by the browser to run for acceptance standard,

2. Acceptance period modification and adjustment including text proofreading accruing from the adjustment, the materials supplied by party a (standard), processing interface size change etc. Revising contents stipulated in the contract within the workload for no extra charge, such as increases in the page, click add function etc., after the actual cost of the charge.

3. Party a in writing to determine whether acceptance.

4 party a deadline for the construction site acceptance fully completed two workdays fails to acceptance, regard as party b's work in conformity with the contract, and inference for acceptance by.

应该可以
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
天堂與地獄2012
2011-02-26 · TA获得超过1362个赞
知道答主
回答量:302
采纳率:0%
帮助的人:172万
展开全部
1. the party can be run through a browser for the acceptance criteria;

2. Acceptance modification and adjustments during the period, including text and wrong adjustments, proofing (the materials provided by Party A as the standard), the size of the interface changes and other treatment. Modifications in the contract for no extra charge within the workload, any increase in the pages and functions, according to the actual cost of the increased charges.

3. Party in writing to determine whether acceptance.

4. Party building inspection period is completed the site within two working days after the overdue acceptance, as Party B's work complies with the Contract, and by inference for the acceptance.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
飞翔安琪儿
2011-02-26 · TA获得超过1779个赞
知道小有建树答主
回答量:723
采纳率:0%
帮助的人:986万
展开全部
1 . the party can be run through a browser for the acceptance criteria;
2. acceptance period of change and adjustment, including adjustment of text content is false, proof (in the standard of materials provided by Party), the size of the interface changes and other treatment.Modifications in the contract for no extra charge within the workload, any increase in the pages and functions, according to the actual cost of the increased charges.
3. Party in writing to determine whether acceptance.
4. Party building inspection period is completed the site within two working days after the overdue acceptance, as Party B's work complies with the Contract, and by inference for the acceptance.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
F左左
2011-02-26
知道答主
回答量:54
采纳率:0%
帮助的人:0
展开全部
1 party a can be launched by the browser to run for acceptance standard, 2. Acceptance period modification and adjustment including text proofreading accruing from the adjustment, the materials supplied by party a (standard), processing interface size change etc. Revising contents stipulated in the contract within the workload for no extra charge, such as increases in the page, click add function etc., after the actual cost of the charge. 3. Party a in writing to determine whether acceptance. 4 party a deadline for the construction site acceptance fully completed two workdays fails to acceptance, regard as party b's work in conformity with the contract, and inference for acceptance by.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
收起 更多回答(3)
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式