Therehasbeenconsiderabledebateoverthelastdecadeorsoontheeffectivenessofconstructionpr... There has been considerable debate over the last decade or so on the effectiveness of construction project planning. However, there is remarkably little research into what construction project planners actually do. The research reported here was undertaken as part of the requirements capture process for the development of the VIRCON system (VCS) as a strategic decision support tool for construction project planners. This larger research project is reported elsewhere [1]. This paper will explore the evidence on the role and practice of project planners that underpinned the development of the VCS. In so doing, it will address what Laufer and his colleagues [2] identify as the operation/systems analysis level of construction scheduling. The paper will first review some of the recent debates on construction project planning. It will then report the results from our interviews with 18 construction planners from five leading UK firms before some conclusions are drawn. 展开
 我来答
herolld
2012-03-27 · TA获得超过469个赞
知道小有建树答主
回答量:255
采纳率:0%
帮助的人:149万
展开全部
There has been considerable debate over the last decade or so on the effectiveness of construction project planning
建设性项目企划的有效性在最近二十年左右引起了相当大的争议.
However, there is remarkably little research into what construction project planners actually do.
然而,对于到底项目企划者到底做什么工作,却几乎没有研究过.
The research reported here was undertaken as part of the requirements capture process for the development of the VIRCON system (VCS) as a strategic decision support tool for construction project planners.
对于RIRCON 系统(VCS)发展过程的捕捉的目的是为建设性项目企划者进行决策性决定的支持工具. 摆在这的这份报告正是作为其要求的一部分来进行的.
This larger research project is reported elsewhere [1].
这个更大的研究项目的报告在其他地方[1].
This paper will explore the evidence on the role and practice of project planners that underpinned the development of the VCS.
本论文将对巩固VCS发展的的项目企划者的角色和实践的证据进行探究.
In so doing, it will address what Laufer and his colleagues [2] identify as the operation/systems analysis level of construction scheduling.
通过这样做,它将得出Laufer和他的同事们[2]识别建设性调度的操作或系统的分析能力.
The paper will first review some of the recent debates on construction project planning.
本论文首先回顾一下最近在建设性项目企划的一些争论.
It will then report the results from our interviews with 18 construction planners from five leading UK firms before some conclusions are drawn.
然后,在得出结论之前, 将会报告我们对从5个英国顶尖公司的18为建设性企划者的采访结果.
ja8son
2012-03-29 · TA获得超过1061个赞
知道小有建树答主
回答量:2098
采纳率:100%
帮助的人:782万
展开全部
没有谁
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
收起 1条折叠回答
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式