“鸟巢”和“水立方”的英文怎么拼?

 我来答
1988球球
推荐于2019-09-22 · TA获得超过8402个赞
知道小有建树答主
回答量:40
采纳率:100%
帮助的人:6282
展开全部

1.北京奥运国家体育场就是俗称的"鸟巢"

"鸟巢"的英文名称是Nest-type Beijing Olympic Stadium或者Beijing National Stadium (Bird's Nest/Olympic Stadium)

鸟巢英文单词是bird nest

2."水立方"的英文是water cube Beijing National Aquatics Cente或water cube 

“鸟巢”和“水立方”的英文简介

Beijing National Stadium

The Beijing National Stadium (traditional Chinese: 北京国家体育场; simplified Chinese: 北京国家体育场; Hanyu Pinyin: Běijīng Guojiā Tǐyuchǎng; Tongyong Pinyin: Běijīng Guojiā Tǐyuchǎng), also known as the National Stadium,[1] or the "Bird's Nest" (鸟巢) for its architecture, is a stadium under construction on the Olympic Green in Beijing, China that is scheduled for completion in March, 2008[2]. The stadium will host the main track and field competitions for the 2008 Summer Olympics, as well as the opening and closing ceremonies. It is located right next to the Beijing National Aquatics Centre.

Design

In 2002, Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. Contemporary Chinese artist, Ai Weiwei, is the Artistic Consultant for design.[3] The ground was broken on Christmas EveDecember2003, and construction started in March2004, but was halted by the high construction cost in August2004 and continued again. In January 2008, concerns about construction working conditions arose when it was revealed that at least 10 workers had died during the stadium's construction.[4] Controversy also surrounded the alleged forced evictions of many residents so the construction could go ahead.

Capacity

The stadium can seat as many as 91,000 spectators during the Olympics. The capacity will then be reduced to 80,000 after the Games. It has replaced the original intended venue of the Guangdong Olympic Stadium[citation needed]. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000 square metres of space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5 billionyuan (≈423 million USD).

Upon completion, this stadium will boast a state of the art Solar PV system produced by Suntech Power[

Beijing National Aquatics Centre

The Beijing National Aquatics Centre, also known as the Water Cube (or abbreviated [H2O]3 [1]), is an aquatics centre that was built alongside Beijing National Stadium in the Olympic Green for the 2008 Summer Olympics. Ground was broken on December 24, 2003.

Design

In 2002, Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. Contemporary Chinese artist, Ai Weiwei, is the Artistic Consultant for design.[3] The ground was broken on Christmas EveDecember2003, and construction started in March2004, but was halted by the high construction cost in August2004 and continued again. In January 2008, concerns about construction working conditions arose when it was revealed that at least 10 workers had died during the stadium's construction.[4] Controversy also surrounded the alleged forced evictions of many residents so the construction could go ahead.

Capacity

The stadium can seat as many as 91,000 spectators during the Olympics. The capacity will then be reduced to 80,000 after the Games. It has replaced the original intended venue of the Guangdong Olympic Stadium[citation needed]. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000 square metres of space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5 billionyuan (≈423 million USD).

Upon completion, this stadium will boast a state of the art Solar PV system produced by

Suntech Power[