急求~~~毕业论文摘要翻译,重谢!!!! 20

工程结算审计是一项既综合又专业性很强的繁杂细致的重要技术工作。在当前审计实务中,工程结算审计风险主要体现在承包合同不规范、建设单位行为不规范、材料成本难以确定、监理单位监... 工程结算审计是一项既综合又专业性很强的繁杂细致的重要技术工作。在当前审计实务中,工程结算审计风险主要体现在承包合同不规范、建设单位行为不规范、材料成本难以确定、监理单位监管不力等方面。这些风险的产生主要是由于建设单位为了规避和转嫁合同风险、建设单位相互配合不够有力、材料市场价格混乱以及监管单位势单力薄等所致。针对其产生原因,提出从完善机制统一对上负责与对下负责、加强宣传优化审计环境、严格执法加大审计力度、提高审计人员技能、加强协调分散风险等方面来防范工程结算审计风险。 展开
 我来答
cc2ttyy
2009-06-04 · 超过15用户采纳过TA的回答
知道答主
回答量:89
采纳率:0%
帮助的人:0
展开全部
谷歌翻译 只可以参考
Billing audit project is an integrated and highly professional and detailed the importance of complicated technical work. In the current audit practice, audit risk clearing works mainly in non-standard contracts, the construction unit is not standardized, it is difficult to determine costs of materials, supervision, etc. The lack of supervision units. The emergence of these risks mainly due to the construction unit and pass the contract in order to circumvent the risks, the construction unit with each other not strong enough, the market price of materials, as well as confusion caused by the monitoring unit, such as weak. For their causes, from improving the mechanisms responsible for the lower and the responsibility to step up publicity to optimize the audit environment, intensify strict law enforcement and audit efforts to enhance staff skills audit, to strengthen coordination in terms of spreading risks, such as settlement of audit risk prevention projects.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
上海桦明教育科技
2024-12-14 广告
上海桦明教育科技有限公司(以下简称桦明教育)是一家经上海市场监督管理部门依法批准,教育主管部门备案监管的专业化、合法化的教育培训单位,华明教育上海教学场地位于杨浦区凤城路101号。 学校软硬件设施齐全,拥有27间标准化敦室(其中两间大教室分... 点击进入详情页
本回答由上海桦明教育科技提供
晚风0996
2009-06-04 · TA获得超过1801个赞
知道大有可为答主
回答量:1579
采纳率:100%
帮助的人:1599万
展开全部
Billing audit project is an integrated and highly professional and detailed the importance of complicated technical work. In the current audit practice, audit risk clearing works mainly in non-standard contracts, the construction unit is not standardized, it is difficult to determine costs of materials, supervision, etc. The lack of supervision units. The emergence of these risks mainly due to the construction unit and pass the contract in order to circumvent the risks, the construction unit with each other not strong enough, the market price of materials, as well as confusion caused by the monitoring unit, such as weak. For their causes, from improving the mechanisms responsible for the lower and the responsibility to step up publicity to optimize the audit environment, intensify strict law enforcement and audit efforts to enhance staff skills audit, to strengthen coordination in terms of spreading risks, such as settlement of audit risk prevention projects.
本回答被网友采纳
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式