
寻找英语达人八一篇中文翻译成英文,土木工程类的摘要,在线等,急
[摘要]:本设计是山岭重丘区扬宜一级公路D标段的方案设计。通过调查研究和分析讨论,掌握所设计课题的有关结构构造、使用功能及质量要求。第一步是公路路线设计,其中包括:平面设...
[摘要]:本设计是山岭重丘区扬宜一级公路D标段的方案设计。通过调查研究和分析讨论,掌握所设计课题的有关结构构造、使用功能及质量要求。第一步是公路路线设计,其中包括:平面设计、纵断面设计、横断面设计;第二步是公路路基设计,包括:路基稳定性设计、重力式挡土墙和加筋式挡土墙设计;第三步是路面设计(包含:刚性和柔性路面);第四步是是施工组织设计,包括:技术方案设计,施工进度设计,工料机调配表;第五步是概预算设计,计算工程总造价。最后,利用专业软件进行电算优化,并给出平面设计纵断面设计、横断面设计相关的表格与图纸和计算成果。
[关键字]:公路设计, 路面设计,施工组织,概(预)算
把以上的这部分文字翻译成英文
最好翻译后的英文要修改修改,符合英国人的说话习惯哪最好 展开
[关键字]:公路设计, 路面设计,施工组织,概(预)算
把以上的这部分文字翻译成英文
最好翻译后的英文要修改修改,符合英国人的说话习惯哪最好 展开
8个回答
展开全部
[Abstract]: This design is re-Mountain Hill District D Yang Yi Road Section 1 of the program design. Through investigation and study and analysis of discussion topics to master the design of the structure, the use of function and quality requirements. The first step is the design of highway routes, including: graphic design, longitudinal design, cross-sectional design; second step is the design of highway roadbed, including: the design of embankment stability, retaining walls and reinforced gravity retaining wall design; The third step is the road design (including: Rigid and Flexible Pavement); the fourth step is the construction of organizational design, including: technical solutions design, construction progress of the design,
Quantity deployment machine table; the fifth step is to estimate budget for the design, calculation of the total cost of the project. Finally, the use of specialized computer software optimization, and graphic design are given vertical section design, cross-sectional design of the forms and drawings and the calculation results.
[Keywords]: highway design, road design, construction organizations, estimates (pre-) operator
Quantity deployment machine table; the fifth step is to estimate budget for the design, calculation of the total cost of the project. Finally, the use of specialized computer software optimization, and graphic design are given vertical section design, cross-sectional design of the forms and drawings and the calculation results.
[Keywords]: highway design, road design, construction organizations, estimates (pre-) operator
展开全部
[Abstract]: The scheme being labeled with Duan designs D designing that mound District throws up and scatters the one-level highway suitable originally being that the mountain ridge duplicates each other. Use the function and the quality requirement by inquiring into the structure studying and analysing structure. The first steps are highway route design , include among them: Graphic designing , vertical section design that , cross section designs that; Second steps are highway subgrade design , include: The stability designs , the dyadic parapet of gravity designs with adding the dyadic parapet of tendon a roadbed; Third steps are that the road surface designs (inclusion: Stiffness and flexibility road surface); Fourth steps are construction organization design , include: The scheme designs , the rate of progress being under construction designs a technology, labour and material machine is rearranged administering medicine to bring out the cold; Fifth steps are to exemplify budget design , calculate general cost of construction of project. The at last , the electricity making use of the special field software to be in progress calculate an optimization, give graphic designing vertical section designs , cross section designs the pertinent table and drawing sheet out the achievement and secretly scheming against together.
[Key words]: The highway designs that , the road surface designs that , construction organization, calculates generally (in advance)
[Key words]: The highway designs that , the road surface designs that , construction organization, calculates generally (in advance)
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
如下:
[Abstract]: This design is re-Mountain Hill District D Yang Yi Road Section 1 of the program design. Through investigation and study and analysis of discussion topics to master the design of the structure, the use of function and quality requirements. The first step is the design of highway routes, including: graphic design, longitudinal design, cross-sectional design; second step is the design of highway roadbed, including: the design of embankment stability, retaining walls and reinforced gravity retaining wall design; The third step is the road design (including: Rigid and Flexible Pavement); the fourth step is the construction of organizational design, including: technical solutions design, construction progress of the design, deployment machine Quantity Table; fifth step is to estimate budget for the design, calculation of total cost. Finally, the use of specialized computer software optimization, and graphic design are given vertical section design, cross-sectional design of the forms and drawings and the calculation results.
[Keywords]: highway design, road design, construction organizations, budget
[Abstract]: This design is re-Mountain Hill District D Yang Yi Road Section 1 of the program design. Through investigation and study and analysis of discussion topics to master the design of the structure, the use of function and quality requirements. The first step is the design of highway routes, including: graphic design, longitudinal design, cross-sectional design; second step is the design of highway roadbed, including: the design of embankment stability, retaining walls and reinforced gravity retaining wall design; The third step is the road design (including: Rigid and Flexible Pavement); the fourth step is the construction of organizational design, including: technical solutions design, construction progress of the design, deployment machine Quantity Table; fifth step is to estimate budget for the design, calculation of total cost. Finally, the use of specialized computer software optimization, and graphic design are given vertical section design, cross-sectional design of the forms and drawings and the calculation results.
[Keywords]: highway design, road design, construction organizations, budget
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
[Summary]:This design is mountain range heavy Qiu area the Yang be proper one the class highway D mark the project of the segment design.Pass to investigate research and analysis discussion, control the topic design of relevant structure structure, usage function and quality request.The square one is a highway route design, include among them:Flat surface design, vertical section design, cross section design;The second step is a highway roadbed design, include:The design, gravity type of the roadbed stability block a soil wall with add a Jin type to block a soil wall design;The third step is a road noodles design(include:Rigid with gentle road noodles);The fourth step is a construction organization design, include:Technique project design, construction progress design, labor and material machine dispensation form;The fifth step is all a budget design, calculation engineering total build price.End, make use of profession the software carry on machine-readable excellent turn, and give flat surface design vertical section design, cross section design related form and diagram paper and calculation result.
[Key word]:Highway design, road noodles design, construction organization, all(prepare) calculate
[Key word]:Highway design, road noodles design, construction organization, all(prepare) calculate
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
designis duqi yixiang gradeⅰhospitals district Highway d road project design.through investigation and analysis of the discussion, to acquire the design issues relating to the structure, use the function and quality requirements.the first step is highway route design, including: graphic design, design, cross section profile design; the second step is to highway design, including: subgrade stability retaining walls and design, grivaty orthogrid - abamurus; the third step is pavement design (which includes: rigid and flexible pavement); the fourth step is to be construction organization design, including: technical solution design, construction progress design, materials and machines the deployment of a table; the design calculation of budget, total project cost.Finally, using specialized software for optimization, electronicalized and warnonclose design, graphic design profile survering design forms and drawings and calculation results. ( Highway d road project design)是公路设计 (highway route design)是路面设计 (construction organization )是施工组织 (calculation of budget)是预算
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
This design is the mountain re-Hill District D Yang Yi Road Section 1 of the program design. Through investigation and study and analysis of discussion topics to master the design of the structure, the use of function and quality requirements. The first step is the design of highway routes, including: graphic design, longitudinal design, cross-sectional design; second step is the design of highway roadbed, including: the design of embankment stability, retaining walls and reinforced gravity retaining wall design; The third step is the road design (including: Rigid and Flexible Pavement); the fourth step is the construction of organizational design, including: technical solutions design, construction progress of the design,
Quantity deployment machine table; the fifth step is to estimate budget for the design, calculation of the total cost of the project. Finally, the use of specialized computer software optimization, and graphic design are given vertical section design, cross-sectional design of the forms and drawings and the calculation results.
[Keywords]: highway design, road design, construction organizations, estimates (pre-) operator
This part of the above text translated into English
Add:
The best English translation to be amended after the modifications, in line with the words of the British habit of which the best
Quantity deployment machine table; the fifth step is to estimate budget for the design, calculation of the total cost of the project. Finally, the use of specialized computer software optimization, and graphic design are given vertical section design, cross-sectional design of the forms and drawings and the calculation results.
[Keywords]: highway design, road design, construction organizations, estimates (pre-) operator
This part of the above text translated into English
Add:
The best English translation to be amended after the modifications, in line with the words of the British habit of which the best
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询