
请达人帮忙将下面这段话翻译成英语。急,在线等。
公司承接各类大小配电、供水、排水的明装,暗装工程。高层、多层、厂房、酒店、综合楼的水电工程施工安装。合作方式多样,包清工、包工包料、分层分栋分区域分项目皆可。自带机械,包...
公司承接各类大小配电、供水、排水的明装,暗装工程。高层、多层、厂房、酒店、综合楼的水电工程施工安装。合作方式多样,包清工、包工包料、分层分栋分区域分项目皆可。自带机械,包做资料,包做工程预结算。有电工进网作业证,有中级造价员上岗证,施工员证,质检员证。公司成立以来,一直以良好的信誉、优良的质量,精益求精的工作态度承装了近万项工程,积累了丰富的经验。近年来,我公司以合理的设计、先进的施工技术承装了众多规模较大的工程,在工程施工中严格狠抓质量、安全生产工作,以良好的工艺和信誉受到电力部门、监理和客户等的一致好评。
请不要复制 粘贴 在线翻译的答案。那样做没意思。。 展开
请不要复制 粘贴 在线翻译的答案。那样做没意思。。 展开
6个回答
展开全部
公司承接各类大小配电、供水、排水的明装,暗装工程。高层、多层、厂房、酒店、综合楼的水电工程施工安装。合作方式多样,包清工、包工包料、分层分栋分区域分项目皆可。自带机械,包做资料,包做工程预结算。有电工进网作业证,有中级造价员上岗证,施工员证,质检员证。公司成立以来,一直以良好的信誉、优良的质量,精益求精的工作态度承装了近万项工程,积累了丰富的经验。近年来,我公司以合理的设计、先进的施工技术承装了众多规模较大的工程,在工程施工中严格狠抓质量、安全生产工作,以良好的工艺和信誉受到电力部门、监理和客户等的一致好评。
Companies of all sizes to take power, water supply, drainage of the prescribed equipment, loaded the dark works. High-level, multi-storey factory, hotel, complex construction and installation of the hydropower project. Cooperation in diverse ways, including the clearance work, contracting package materials, building layered sub-sub-sub-regional projects can be. Bring their own machines, so the information package, including pre-clearing do works. There are electricians into the net operating permit, a mid-level job cost card members, the construction permit staff, quality inspector certification. Since its establishment, has a good reputation, excellent quality, better work for the project nearly installed, and accumulated a wealth of experience. In recent years, I have a reasonable design, advanced construction technology equipment for many large-scale projects in the works strictly to improving quality, safety in production to a good process and the credibility of the electricity sector, supervision and customer such as praise.
Companies of all sizes to take power, water supply, drainage of the prescribed equipment, loaded the dark works. High-level, multi-storey factory, hotel, complex construction and installation of the hydropower project. Cooperation in diverse ways, including the clearance work, contracting package materials, building layered sub-sub-sub-regional projects can be. Bring their own machines, so the information package, including pre-clearing do works. There are electricians into the net operating permit, a mid-level job cost card members, the construction permit staff, quality inspector certification. Since its establishment, has a good reputation, excellent quality, better work for the project nearly installed, and accumulated a wealth of experience. In recent years, I have a reasonable design, advanced construction technology equipment for many large-scale projects in the works strictly to improving quality, safety in production to a good process and the credibility of the electricity sector, supervision and customer such as praise.
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询