求英语翻译,不要机翻,小妹在此感谢!
2. New products need to combine with the best production process, to reduce waste maximum , make Standard Test Dose (STD) which is closely related to actual production status.
3, According to the customer flexible need in different periods of the order ,work out the best Line layout design and optimize factory production capacity to meet the needs of customers
4. Take improvement of production efficiency as the goal, pick a large quantity of orders for products, to complete a Line balance improvement every one or two weeks
5. Puts forward corresponding fixture optimization, automation scheme to improve plant manufacturing capability, and thus to minimize waste and finally achieve cost reduction goals.
6. Within the required timing, complete the PCR/ECR signature and content changes, to achieve zero error requirement.
7. BOM in the SAP set up/modification should be on time, to achieve zero error requirement.
8. ROUTING in the SAP set up/modification should be on time, to achieve zero error requirement.
9. New products need to Reveiwed ME provide a FLOW CHART is the best optimized, as much as possible to reduce laber cost.
10. Do the JDI projects, participate in LEAN project, SAVING 50 k is this year target.
11.Need to review monthly scrap rate of large-order products in order to reduce waste and improve the product profit.
12. Every 3 months, regarding the outsoucing products (subcon) a large quantity of Process&STD & the productivity improvement Should be calculated which involving the large quantity of order products.
1. The attendance rate of trial ruin meeting must be 100%, put forward the design & process project for the product to ensure the smooth production.
2. The new product need combine the best production process to reduce the waste in the maximum extent, the established STD must close the actual production status.
3. Make the best Line layout design according to the flexible change of customer order in the different period, optimize the in-plant production capacity to meet the requirement of customers.
4. Target to improve the production efficiency, select the product with big orders and finish one Line balance improvement in 1or 2weeks.
5. Put forward the optimized, automation project to improve the in-plant manufacturing capacity to reduce the waste and get the goal of cost reduction.
6. Finish the PCR/ECR sign-off and content modification to achieve the error rate of 0%.
7. The establishment/modification of BOM in the SAP must be timely and the error rate must be zero.
8. The establishment/modification of routing in the SAP must be timely and the error rate must be zero.
9. The flow chart of new product provided by Review Me should be the most optimized, reduce the labor cost as much as possible.
10. Make the JDI project and take part in Lean project , the target of this year is saving 50K.
11. Need the scrape rate of the product with large order, reduce the waste, improve the product profit.
12.Make the process&STD&productivity improvement for the sub-contractor product every three month.
the attendance of trial run meeting is required to be 100%, put forward some optimization plans and processing procedure on production, make sure it can successfully go into operation
the new product is supposed to produced in the best production process, which makes the least waste. the STD should accords with actual production situation.
draft the best Line layout design according to the change of order forms in different periods, keep improving productivity to satisfy customer's need.
Aim to enhance production efficiency and choose products in large order forms, plan to finish each Line balance improvement weekly or fornightly.
propose the melioration plans of tools and automatization projects to strengthen manufacturing capacity so as to eliminate waste and beat the target of reducing the cost
Sign for PCR/ECR and revise it before deadline, which demands no error.
Establishing and amending BOM in SAP are required to be timely and totally accurate.
Establishing and amending ROUTING in SAP demands to be timely and accurate.
new product needs review and the Flow Chart given by ME is optimal, spare no effort to lower the laber cost.
Do JDI project and take part in LEAN project, target saving for this year is 50K
Review scrap rate of productions in great demand every month, cut down the cost and increase the profit.
lay down some process&STD&productivity improvement for products in great demand in subcontract each season.
望采纳,谢谢
the
purpose
of
education
should
be
to
cultivate
useful
talents
for
the
community,
because
many
of
the
education
is
public,
the
educator
should
return
to
society.
the
purpose
of
education
should
be
to
cultivate
useful
talents
for
the
community,
because
many
of
them
are
public
education,
the
educator
should
return
to
society.