工程施工与工程结算在金蝶软件资产负债表中应该如何设

 我来答
幸福千羽梦
2018-05-30 · TA获得超过11.1万个赞
知道大有可为答主
回答量:3万
采纳率:91%
帮助的人:6478万
展开全部

工程施工减工程结算  如果是正数 在存货反映,

工程施工减工程结算   如果是负数 在预收账款反映

首先 设置在成本科目下

金蝶KIS专业版 资产负债表设置公式

存货期答答末余额

=ACCT("1321","Y","",0,0,0,"")-ACCT("2314","Y","",0,0,0,"")+ACCT("1401:1406","Y","",0,0,0,"")+ACCT("1408","Y","",0,0,0,"")-ACCT("1407","Y","",0,0,0,"")+ACCT("1411","Y","",0,0,0,"")+ACCT("5001","Y","",0,0,0,"")+ACCT("5201","Y","",0,0,0,"")-ACCT("1471"清和慧,"Y","",0,0,0,"")+ACCT("5401","JY","",0,0,0,"")-ACCT("5402","JY","",0,0,0,"")

存货年初余额

=ACCT("1321","C"棚友,"",0,1,1,"")-ACCT("2314","C","",0,1,1,"")+ACCT("1401:1406","C","",0,1,1,"")+ACCT("1408","C","",0,1,1,"")-ACCT("1407","C","",0,1,1,"")+ACCT("1411","C","",0,1,1,"")+ACCT("5001","C","",0,1,1,"")+ACCT("5201","C","",0,1,1,"")-ACCT("1471","C","",0,1,1,"")+ACCT("5401","JY","",0,1,1,"")-ACCT("5402","JY","",0,1,1,"")

预收账款期末余额

=ACCT("2203","DY","",0,0,0,"")+ACCT("1122","DY","",0,0,0,"")+ACCT("5401","DY","",0,0,0,"")-ACCT("5402","DY","",0,0,0,"")

预收账款年初余额

=ACCT("2203","DC","",0,1,1,"")+ACCT("1122","DC","",0,1,1,"")+ACCT("5401","DY","",0,1,1,"")-ACCT("5402","DY","",0,1,1,"")

以上是基本思路,可以根据自己的需要进行调整。

推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式