急急,谁帮忙翻译一下,周一要交了,谢谢

record.[Asamended2-21-89]C.Itshallbeincumbentupontherepresentativesoftheapplicantfora... record. [As amended 2-21-89]
C. It shall be incumbent upon the representatives of the applicant for a Conditional Use Permit to provide documentation and evidence in support of the proposal. It shall also be the obligation of said applicant, to furnish evidence, or proof of compliance with the specific and general criteria contained in this Ordinance.
9.3.5 Basis of Planning Commission Decisions: The Planning Commission's decision shall be based upon compliance with the specific requirements contained elsewhere in this Ordinance and the general standards listed below:
A. General compliance with the applicable land use policies contained in the Watertown Charter Township Comprehensive Development Plan.
B. Public facilities must be adequate or can be made adequate to serve the proposed project. Specifically, that existing roads, schools, storm water drainage, fire protection, police, and emergency medical care are adequate to serve the proposed project.
C. On-site sanitation facilities including sewage disposal, potable water supply, storm water, and solid waste disposal must be properly designed and capable of handling the long term needs of the proposed project.
D. The proposed project will not have a substantial permanent adverse effect on the market value of surrounding property.
E. The proposed project is not located such that it will directly or indirectly have a substantial adverse impact on the natural resources of the Township. Specifically, prime agricultural soils water recharge areas , lakes, rivers, streams, major forests, wetlands, wildlife areas and major sand, gravel or mineral deposits.
A.The proposed project causes no hazard to surrounding and nearby property nor any conflict with or unreasonable disturbance to the existing use and quiet enjoyment of surrounding or nearby property.
9.3.6 Statements of Conclusion: The Planning Commission shall specify in writing the conclusion and findings on each request in erms of the general standards listed above in Section 9.3.5 of this Ordinance.
9.3.7 Required Approval by Planning Commission shall approve a request for Conditional Use Permit for any applicant which fully meet the feneral standards and specific standards contained in this Ordinance.
麻烦高手翻译一下,不要用什么google翻译啦,这是要上交的,不是光明白意思而已,谢谢各位了。。。。
展开
liuyong123045
2010-03-27
知道答主
回答量:13
采纳率:0%
帮助的人:0
展开全部
修正2-21-89记录。)
它应义不容辞的责任的代表申请人提供文件的使用权和证据支持这个建议。它也应当承担保密义务的说,提供证据的申请人,或证明符合特定的和通用标准包含在本条例。
9.3.5校园规划委员会的决定:规划委员会的决定应根据具体要求,符合本条例》以及其他包含以下的通用标准。
答:一般遵守适用的土地使用政策中所含的综合开发规划到宪章之乡。
公共设施必须足够四须鲃或可做好充分的服务项目。确切地说,现有道路、学校、风暴排水、消防、警察、紧急医疗保健服务提出了适当的项目。
现场卫生设施之污水处理,饮用水供应、暴雨、固体废物处理处置必须妥善设计与处理的长远需求的项目。
该项目将没有实质性的永久的不利影响,它的市场价值周围的财产。
e提议的项目并不存在这样的,它将直接或间接的重大不利影响的自然资源之乡。确切地说,主要农业土壤水补给区、湖泊、河流、河流、森林、沼泽、野生动植物园和主要的沙子,碎石或矿藏。
一。这个项目没有造成危害到周围和附近的财产,也没有任何冲突造成或不合理的使用和安静的存在或附近享受周围的财产。
结论:9.3.6的规划委员会应当书面说明的结论,发现在每个请求的一般标准erms上面列出的9.3.5节。
9.3.7要求予以批准计划委员会申请条件使用许可证申请人充分满足feneral标准和特殊标准包含在本条例。
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
G芬妮·博铃
2010-03-28
知道答主
回答量:9
采纳率:0%
帮助的人:0
展开全部
记录。 [经2-21-89]
C.它应义不容辞地为一对有条件使用证申请人的代表提供文件和支持这项建议的证据。此外,也应说是义务的申请,向其提供证据,或在本条例中的具体和一般标准的情况证明。
9.3.5依据规划委员会的决定:规划委员会的决定应于收到的具体规定中的其他地方和本条例下列一般标准:
A.一般遵守适用的土地使用在水城宪章乡综合开发计划中的政策。
B.公共设施必须充分或可足以应付的项目。具体而言,现有的道路,学校,雨水排水,消防,警察和紧急医疗服务是足够的项目。
长现场卫生设施,包括污水处理,饮用水供应,雨水和固体废物处理,必须经过适当的设计处理能力的长远需要的项目。
D中拟议的项目不会有实质性的永久对周边物业的市场价值产生不利影响。
E.本拟议的项目不位于这样,它将直接或间接有权对乡镇的自然资源造成的不利影响。具体来说,主要农业区土壤水分补给,湖泊,河流,小溪,主要森林,湿地,野生动植物地区及主要沙,砾石或矿藏。
答:拟议的项目不会造成危害周围和附近的财产也没有任何干扰或不合理的现有用途和周围或附近的财产享有安静的冲突。
9.3.6报表的结论:规划委员会应以书面的结论,并在上述各节本条例9.3.5所列的一般标准术语:请求的结果。
9.3.7必要的批准由计划委员会批准一项有条件使用证申请人的任何完全达到feneral标准和本条例中的具体标准要求。
本回答被提问者采纳
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式