TS/16949审核表中 ET ,PT,SOP表示什么意思

 我来答
木鸢飞
2013-01-14 · TA获得超过110个赞
知道答主
回答量:16
采纳率:100%
帮助的人:12.3万
展开全部
找了些资料,不系统。以下为个人理解,供参考。

1、ET阶段(Engineering Trial,工程调试——设计验证阶段):在车型开发初期,有设计公司对白车身的精度以及各个空位的精度进行验证和修正的阶段。
典型要求:模具标准化,工艺标准化,零部件与整车结构标准化,品质判定标准化。

2、PT阶段(Production Trial,生产调试——生产验证阶段):在通过了设计公司的设计验证后,在小批量的生产过程中,对车身的线上可操作性、零件的品质及包装的标准化进行验证和改善阶段。
典型要求:设备与工装夹具到位,人员到位,物料配套到位,生产性达标(工艺直通率、品质保障力与物料批产验证)

3、PP:预生产——初期量产
典型要求:工艺规范化、物流规范化,包装规范化、工位器具规范化、节拍符合设计要求、人员与训练组织到位

4、 SOP阶段(Start Of Production,小批量生产阶段):各项验证完成,进入投放市场的小批量生产。
典型要求:按设计节拍实现标准化作业
中邦实验室认证
2024-06-05 广告
ISO17025是国际通用的实验室和质量管理体系认证标准,主要适用于实验室和检验机构的认可和规范化管理。该认证旨在确保实验室和检验机构具备正确、规范、高效的测试和校准能力,以保证测试数据的准确性和可靠性。通过ISO17025认证,可以使实验... 点击进入详情页
本回答由中邦实验室认证提供
两打1
2010-07-16 · TA获得超过3132个赞
知道大有可为答主
回答量:3336
采纳率:25%
帮助的人:1956万
展开全部
  Dear HR Leadership:
  Hello!
  Recently learned that your company is recruiting a post production engineer, I would like to try their luck. Allow me to introduce myself, to disturb your precious time!

  CVs

  Intention job: manager or production engineer.
  Name: aa
  Exit and Entry: aa
  Sex: Male
  Profession: Chemical Engineering and Technology
  Date of Birth: February 7, 1980
  Education: College in June 2001 and graduated from College of Engineering XX
  (Correspondence is now Nanjing University of Chemical Engineering undergraduate)
  Tel: xxxxxxx
  E-Mail: xxxx
  Work experience: 8 years working experience in chemical industry
  Now position: regular day shift Production Supervisor
  Inaugural experience: the production of craft
  Shift in charge
  Regular day shift charge
  An overview of the individual ability:
  1. Familiar with production processes in the production of gas formaldehyde fixed-bed reactor technology, synthesis of chloro-methane production process, trioxane production process, including the process of flash concentrator, the reaction and the reaction of one distillation tower, extraction column, packed tower, bubble cap tower, ordinary distillation, shielding pumps, reciprocating pumps, centrifugal pump, multistage pump, steam jet pump, centrifugal blower, Roots blower, such as the commissioning and operation of equipment.
  2. Familiar with the utility installed with activated sludge wastewater treatment process, screw compressed air equipment, preparation of molecular sieve nitrogen devices, preparation of yin and yang resin water tower installations.
  3. Operation and quality adjustment control, to use PDCA rules and practices in the seven QC tools for the guidance of some of their work.
  4. Familiar with DCS, PLC process control environment, and from the perspective of improving the control process.
  5. 6S familiar with the scene management, and to develop effective 6S and give the implementation of improvement plans.
  6. TS16949 system studied, to develop the general management of the standardization of documents, as well as the production process of SOP.
  7. A preliminary understanding of and participation in ISO14001 environmental control system and ERP enterprise resource planning to have a preliminary understanding.
  8. To the production of relevant documents, for staff training in effective security.
  9. To provide a complete, effective production planning, material requirements planning, material planning inventory indicators; deal with production, quality, material unusual accident.
  10. The production of the recipients of the workshop materials, material loss control tracking, audit.

  The contents of the current post:
  1. To develop and modify the course of production process related to SOP, revision and adjustment of process parameters.
  2. Revise and update the PID map.
  3. DCS control methods to adjust and correct PID parameters.
  4. Through the development of a number of QC charts to control and track product quality and production process control.
  5. The collection of some of the production process, and organizations met to discuss solutions to develop into the relevant documents, training staff to operate.
  6. A new factory to process the staff training.
  7. To assist the production manager of the factory 6S promote project management.
  8. To help promote the facility ESH Division PHA project management.

  Economic tide in the market today, I am deeply aware of what is needed now is not only a diploma, but the actual capability of the need to have a certain talent, in which, under the guidance of thinking, I still firmly believe that the pragmatic truth. The same pressures and opportunities, the talent market competition has become tighter, as well as the desire to come to the fore, prompted me to seek quality in their own enrichment and improvement.
本回答被网友采纳
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
向天致信
高粉答主

推荐于2017-09-18 · 说的都是干货,快来关注
知道大有可为答主
回答量:6284
采纳率:90%
帮助的人:631万
展开全部
1、ET阶段(Engineering Trial,工程调试——设计验证阶段):在车型开发初期,有设计公司对白车身的精度以及各个空位的精度进行验证和修正的阶段。
典型要求:模具标准化,工艺标准化,零部件与整车结构标准化,品质判定标准化。
2、PT阶段(Production Trial,生产调试——生产验证阶段):在通过了设计公司的设计验证后,在小批量的生产过程中,对车身的线上可操作性、零件的品质及包装的标准化进行验证和改善阶段。
典型要求:设备与工装夹具到位,人员到位,物料配套到位,生产性达标(工艺直通率、品质保障力与物料批产验证)。
3、PP:预生产——初期量产
典型要求:工艺规范化、物流规范化,包装规范化、工位器具规范化、节拍符合设计要求、人员与训练组织到位。
4、 SOP阶段(Start Of Production,小批量生产阶段):各项验证完成,进入投放市场的小批量生产。
典型要求:按设计节拍实现标准化作业。
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
收起 1条折叠回答
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式