以下内容翻译成英语,谢谢 20

7载带机工作程序7.1总经办派出订单给注塑部,注塑部依照订单要求,联系相关部门,准备好模具以及相关物料。7.2生产前,注塑部依照产品图纸以及客户要求设定载带机的工艺参数。... 7 载带机工作程序
7.1 总经办派出订单给注塑部,注塑部依照订单要求,联系相关部门,准备好模具以及相关物料。
7.2 生产前,注塑部依照产品图纸以及客户要求设定载带机的工艺参数。并提供样品给QC检验确定,如果样品尺寸、外观以及相关功能均合格,则继续生产,如样品不合格相关要求,QC需及时反映到注塑部,以便注塑部能跟进调整相关工艺参数,确保产品质量达到图纸以及客户的要求。
7.3 在生产过程中,QC应定时巡查,确保品质在相关要求之内。并把其检验结果记录在检验报告里。
展开
 我来答
匿名用户
2017-08-30
展开全部
7 carrier working procedure
7.1 the general manager shall send orders to the injection molding department. The injection molding department shall contact the relevant departments according to the order requirements, and prepare the molds and related materials.
7.2 before production, the injection molding department shall set the technical parameters of the carrier according to the product drawings and customer requirements. And provide the samples to QC inspection, if the sample size, appearance, and related functions are qualified, then continue to produce, if the sample requirements, QC should be reflected in the molding department in time, so that molding department can follow up adjusting the process parameters, to ensure product quality of drawing and customer requirements.
7.3 during the production process, QC shall check periodically to ensure the quality is within the relevant requirements. And the test results are recorded in the inspection report.
斋煊0iI
2017-08-30 · TA获得超过318个赞
知道小有建树答主
回答量:981
采纳率:0%
帮助的人:472万
展开全部
没空给你翻译,自己找翻译词典吧
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
要解体成分子的人
2017-08-30 · TA获得超过9.7万个赞
知道顶级答主
回答量:8.8万
采纳率:96%
帮助的人:4209万
展开全部
7 载带机工作程序
7.1 总经办派出订单给注塑部,注塑部依照订单要求,联系相关部门,准备好模具以及相关物料。
7.2 生产前,注塑部依照产品图纸以及客户要求设定载带机的工艺参数。并提供样品给QC检验确定,如果样品尺寸、外观以及相关功能均合格,则继续生产,如样品不合格相关要求,QC需及时反映到注塑部,以便注塑部能跟进调整相关工艺参数,确保产品质量达到图纸以及客户的要求。
7.3 在生产过程中,QC应定时巡查,确保品质在相关要求之内。并把其检验结果记录在检验报告里。

7 carrier working procedure
7.1 the general manager shall send orders to the injection molding department. The injection molding department shall contact the relevant departments according to the order requirements, and prepare the molds and related materials.
7.2 before production, the injection molding department shall set the technical parameters of the carrier according to the product drawings and customer requirements. And provide the samples to QC inspection, if the sample size, appearance, and related functions are qualified, then continue to produce, if the sample requirements, QC should be reflected in the molding department in time, so that molding department can follow up adjusting the process parameters, to ensure product quality of drawing and customer requirements.
7.3 during the production process, QC shall check periodically to ensure the quality is within the relevant requirements. And the test results are recorded in the inspection report.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
收起 更多回答(1)
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式