请帮忙翻译一段合同方面的英语,谢谢。
Acontractorinpreparinghistenderisrequiredtoenteraunitrateorapriceagainsteachitem.Theb...
A contractor in preparing his tender is required to enter a unit rate or a price against each item. The bill of quantities is often prepared for work that has been only partly designed and detailed, and for which all the detailed drawings are not yet available. Hence the quantities in the bill are approximate. Similarly, a schedule of rates is a list of categories of work believed to be required in the works (but with no quantities given) against which the tenderer is expected to write in the rate required for carrying out one unit of measurement of the item. An alternative method to the tenderer quoting a rate is for the consultant who prepares the schedule of rates to insert suitable rates and to require the tenderer to quote a percentage by which the tenderer wishes to raise or lower them if awarded the contract.
展开
展开全部
承包商在编制招标必须输入一个单位费率或价格对每个项目。此清单往往是准备工作已经仅仅部分,并详细设计,为所有的详图不是可利用的。因此在比尔正在逼近。同样,一个时间表的利率是类别的一个列表的工作被认为是必需的作品(但没有给出的数量),招标人有望在率所需执行一个计量单位的项目。另一种方法向招标人的引用率是谁准备计划的顾问插入到合适的利率,利率要求投标报价百分比由招标人希望提高或降低他们如果合同授予了。
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询