英语短文改错!急!!

英语改错:Theimpactofmajorconstructionprojectsonexisted1geologicalfeaturesmayresultinunfor... 英语改错:
The impact of major construction projects on existed 1
geological features may result in unforeseen and disastrous consequences.
This is illustrated by one of the worst dam disasters in the history 2
that occurred at the Massa Dam on 1 April 1958 only two years
after the dam had been open to international acclaim as one of 3
the great engineering achievements of 20th century. Designed 4
to supply electricity for the region’s developing industrial sector and
irrigation for the farmers of the arid Lower Massa Bassin, the
massa project took seven years to complete. It took mere seven 5
minutes to collapse as an enormous landslide composed in over 6
180 million cubic metres of rock tumbled down the right bank. As the
wave poured down the valley, it swept three high-level bridges and 7
obliterated the town of Sesai, killing their 1000 inhabitants. The 8
wave was already 50 meters high when reached the Kere River 9
over two kilometers away. The Massa disaster bore a striking resemblance
to the Ryshkyk tragedy of 1949 which 500 people had been killed 10
by a wall of water which had overtopped the dam abutments.
展开
dvd627
2010-11-12
知道答主
回答量:0
采纳率:0%
帮助的人:0
展开全部
1. exsited 改成 exsiting
2. in the history 改成 in history
3. had been 改成 was
4. great 改成 greatest
5. mere 改成 merely
6. in 改成 of
7. down 改成 into (pour down 是推倒,pour down a wall)
8. their 改成 its
9. reached 改成 reaching
10. which 改成 where

额,突然发现ls是团长。不过团长好像说错两个。
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
巧手成妈妈
2010-10-31
知道答主
回答量:0
采纳率:0%
帮助的人:0
展开全部
1. exsited → exsiting
2. 去掉第二个the
3. to → with
4. great → greatest
5. mere → merely
6. in → of
7. 无错
8. their → its
9. reached → reaching
10. 在1949和which中间加入in

参考资料: 英语牛人团

本回答被提问者采纳
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式