请大家帮忙翻译一下,汉译英!!!谢谢!

方案A:首检及试验时间均延期至2月中旬,但因制动系统在首检合格后需要6至7周的时间包装和发运,首批货的交货期将推迟一个月,也就是说整车的交货期将推迟一个月。特别着急~~最... 方案A:首检及试验时间均延期至2月中旬,但因制动系统在首检合格后需要6至7周的时间包装和发运,首批货的交货期将推迟一个月,也就是说整车的交货期将推迟一个月。
特别着急~~最好能在下午2点前,谢谢大家啦~~~
展开
梁小巫
2010-12-16 · TA获得超过152个赞
知道小有建树答主
回答量:113
采纳率:0%
帮助的人:0
展开全部
Solution A: The time of the first inspection and the testing time are both postponed to the middle of February. However, there should be six to seven weeks to pack and transport the breaking system after it is tested qualified in the first inspection. Therefore, the date of delivery of the first batch of goods will be late for a month, which is to say, the date of delivery of the whole car will be late for a month.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
百度网友593ac4a
2010-12-16 · 超过30用户采纳过TA的回答
知道答主
回答量:80
采纳率:0%
帮助的人:73.6万
展开全部
Solution A: first checks and test time all adjourned until mid-february, but for brake system in the first inspection qualified needs after 6 to 7 weeks packing and delivery, the first goods delivery leadtime will delay A month, i.e. vehicle delivery will be postponed A month.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
gujianhan
2010-12-16 · TA获得超过6.9万个赞
知道大有可为答主
回答量:2.5万
采纳率:64%
帮助的人:1.2亿
展开全部
Plan A: The first inspection and test time will be postponed to mid-February 2011, and the delivery will be delayed for one month due to the packing and the delivery of the brake system needs a period of 6-7 weeks after passing the first inspection, so that the first delivery (i.e. the delivery of finished vehicle) will be postponed for one mounth.

人译,请放心采纳
本回答被提问者和网友采纳
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
Illuvya
2010-12-16 · TA获得超过139个赞
知道答主
回答量:131
采纳率:0%
帮助的人:85.1万
展开全部
Scheme A: both first inspection and test schedule is postponed until mid February, furthermore, after first quality inspection of the break system, we need 6 to 7 weeks for packaging and delivery, so the first delivery will be delayed 1 month, which means the delivery of the vehicle will be delayed 1 month.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
lemmenqin
2010-12-16 · TA获得超过2.2万个赞
知道大有可为答主
回答量:3717
采纳率:0%
帮助的人:1272万
展开全部
Scheme A:
Both of the first round check and test are postponed to the middle of February.But the brake assembly needs 6 to 7 weeks to be packed and delivered after the first round check qualified,therefore,the first batch of the goods will be postponed to be delivered one month later.That is to say the whole assemly of the auto will also be postponed to be delievered.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
收起 更多回答(4)
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式