4 days
展开全部
The first worker can do 1/6 of the job, while the second worker can do 1/12. So they can do 1/4(1/6+1/12=1/4) of the job. It means they will take 4 days to complete the whole job.
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
如果一名工人的报酬可以完成在6天,第二职工以完成相同的12日要花多长时间那他们一起工作?