新概念英语第二册64课摘要写作跪求
展开全部
The tunnel, which the French engineer, Aime Thome, planned to build under the English Channel in 1858, would be ventilated by tall chimneys built above sea level. An Englishman, William Lowe, suggested a better plan two years later. Passing trains would solve the problem of ventilation in his proposed double railway-tunnel because they would draw in fresh air behind them. Though work began forty-two years later, it was stopped because the British feared invasion. However, the tunnel was officially opened on March 7, 1994.
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询