
求大神帮忙翻译一下这句英语,程序翻译的太美,我快被他蠢哭了
Ifthedeviationfortherevisitfromthepreviousmeasurement(s)exceedstheseuncertaintylevels...
If the deviation for the revisit from the
previous measurement(s) exceeds these uncertainty levels, a further investigation
into gross errors and falsely estimated integer ambiguities should be
conducted. Since the uncertainty levels are computed based on a diagonal variance–covariance
matrix in the law of error propagation, with no temporal correlation, the
revisit should be performed with an appropriate time separation between the measurements. 展开
previous measurement(s) exceeds these uncertainty levels, a further investigation
into gross errors and falsely estimated integer ambiguities should be
conducted. Since the uncertainty levels are computed based on a diagonal variance–covariance
matrix in the law of error propagation, with no temporal correlation, the
revisit should be performed with an appropriate time separation between the measurements. 展开
2015-04-16
展开全部
如果偏差从以前的测量访问超过了这些不确定性的水平,进一步的调查,严重的错误,并错误地估计整周模糊度应该进行。由于不确定性的水平是基于一个对角线方差 - 协方差计算,基质中的错误传播定律,没有时间相关性,therevisit应与测量之间的适当时间间隔来执行。
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询