电厂概况厂址位于印度尼西亚北苏门塔腊、班达亚齐省沿海边。规划容量3×16.5MW机组,本期工程建设2台16.5MW凝汽式机组,留有再扩建1台同容量机组的条件。本期工程的装... 电厂概况
厂址位于印度尼西亚北苏门塔腊、班达亚齐省沿海边。规划容量3×16.5MW机组,本期工程建设2台16.5MW凝汽式机组,留有再扩建1台同容量机组的条件。本期工程的装机规模为3炉2机,电厂的终期规模按4炉3机考虑。发电自给。电厂的补给水源取用地下水,循环冷却水采用海水冷却。电厂采用灰、渣分除系统。锅炉炉底渣经过滚筒冷渣机进入渣斗,锅炉采用炉内添加石灰石脱硫,尾部烟气采用布袋除尘器,除尘器灰斗的灰采用气力除灰方式。两台机组设置一个集中控制室。
展开
千语心s2
2007-03-06 · TA获得超过1669个赞
知道小有建树答主
回答量:441
采纳率:0%
帮助的人:550万
展开全部
Power station general situation
The factory site locates Indonesia north of Shamuttera , Banda Aceh the circumlittoral side of the province.Program capacity 3×16.5MW aircrew, this engineering to constucted 2 sets of 16.5 MW coagulate vapor type machine set, stayed to extend again 1 sets together capacity machine the condition of the set.This expects engineering to pack the machine scale as 3 heats 2 machines, the power station expects scale to press 4 heats 3 machines consideration eventually.Generate electricity self-sufficient.The replenishment headwaters of power station takes to use groundwater, cooling off water adoption sea water cooling circularly.The power station adopts ash, residue for cent in addition to system.Boiler stove the bottom residue gets into residue dry measure through the roller cold residue machine, increasing limestone to take off sulphur inside boiler adoption stove, the coda smoke spirit adoption calico sack in addition to dust machine, in addition to the ash of the dust machine ash dry measure adoption physical strength in addition to ash method.Two set machine the set establish a concentration control room.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
wushamao1
2007-03-09 · TA获得超过797个赞
知道小有建树答主
回答量:308
采纳率:0%
帮助的人:149万
展开全部
用了半个多小时才翻译出来,不知道合适不合适,肯定有更好的翻译,呵呵~~~~~~!!!Site of factory lie Indonesia the north the tower cured, class reach inferior neat province coastal side. Plan the capacity 3*16.5MW unit, this issue of engineering construction 2 16.5MWs congeals the vapour type aircrew, leaves and extends 1 more condition with the capacity unit. This issue of installation of project scale 3 stove 2 machine, final scale of power plant consider according to 4 stove 3 plane. It is self-sufficient to generate electricity. Take the groundwater in supply source of water of the power plant, the cooling water of circulation adopts the sea water to cool. Except that the system that the power plant adopts the dust, dreg to divide. Boiler stove bottom dreg enter cylinder cold dreg machine dreg fight, boiler adopt stove add the desulphurization of lime stone, the exhaust gas of tail adopts the sack cleaner, the dust of the dust remover hod adopts the dirt-removing way of the strength. Set up a centralized control room with two units.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
幻影魔盗
2007-03-11 · TA获得超过2102个赞
知道小有建树答主
回答量:520
采纳率:0%
帮助的人:0
展开全部
Power station general situation
The factory site is located on Indonesia north Su a door tower La, class to reach second together province coast side.The programming capacity is 3, this period engineering construction 2 the set 16.5 MW Ning vapor type machine set, stay to have again extension 1 together capacity machine the condition of the set.Pack of this period engineering machine scale's ising 3 heats is 2 machines, power station of eventually period scale press 4 heat 3 machine consideration.Generate electricity self-sufficient.The replenishment of the power station headwaters take to use groundwater, circulation cool off water adoption sea water cool off.Power station adoption ash, residue cent in addition to system.Boiler stove the bottom residue through the roller cold residue machine get into residue Dou, add limestone to take off sulphur inside boiler adoption stove, coda smoke spirit adoption calico sack in addition to dust machine, in addition to the ash of the dust machine ash Dou adoption physical strength in addition to ash way.Two the set machine's set's constitution be a concentration control room.
本回答被网友采纳
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
bdhcx
2007-03-17 · TA获得超过132个赞
知道答主
回答量:147
采纳率:0%
帮助的人:0
展开全部
看看我这篇译文如何
Profile of Indonesia's North Sulawesi site at the plant gate tower Greece, while the coastal province of Banda Aceh. Planning capacity of 3 x 16.5MW units, the current construction of two 16.5MW condensing turbine unit. have a further expansion of Taiwan with the capacity of one crew conditions. 3 furnace capacity of the current size of two aircraft, the final size of the plant by 4 Furnace 3 plane consideration. Generating self-sufficiency. Groundwater access to the water supply plant, cooling water circulating cooling water used. Plants ash, slag pm, except for the system. After cooling drum boiler slag slag into Java, thus adding limestone FGD boiler furnace. flue gas using bag filter, the filter using pneumatic ash gray ash hopper way. Two units of the establishment of a centralized control room.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
仲岩州
2007-03-06 · TA获得超过287个赞
知道小有建树答主
回答量:225
采纳率:0%
帮助的人:94.6万
展开全部
你去金山快译自己翻译吧.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
收起 更多回答(3)
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式