跪求专业英语高手~~救命
大虾们!能不能帮忙翻译一段文字呀!翻译成英文!这是作业老师留的!请大虾赐教呀!谢谢了!文章如下:沥青混合料应采用较大吨位的自卸车运输,运输车的运量应较摊铺速度有所富余,施...
大虾们!能不能帮忙翻译一段文字呀!翻译成英文!这是作业老师留的!请大虾赐教呀!谢谢了!文章如下:沥青混合料应采用较大吨位的自卸车运输,运输车的运量应较摊铺速度有所富余,
施工过程中摊铺机前方应有运料车在等候卸料,运输车车厢应清扫干净,加蓬布覆盖以
保温、防尘、防雨。沥青碎石采用机械摊铺,摊铺时,严格按照操作规程进行,控制好摊铺温度,
压实厚度和摊铺速度,经摊铺机摊铺并初步压实的摊铺层应符合平整度、横坡度的规定要求。 展开
施工过程中摊铺机前方应有运料车在等候卸料,运输车车厢应清扫干净,加蓬布覆盖以
保温、防尘、防雨。沥青碎石采用机械摊铺,摊铺时,严格按照操作规程进行,控制好摊铺温度,
压实厚度和摊铺速度,经摊铺机摊铺并初步压实的摊铺层应符合平整度、横坡度的规定要求。 展开
1个回答
展开全部
The bituminous mixture should use an greater tonnage the dump truck transportation, the transport vehicle transportation amount should comparatively spread the shop speed to have richly -odd, in the construction process front the paver should have the charging lorry to wait for 卸料, the transport vehicle compartment should sweep clear cleanly, the Gabonese cloth cover keeps warm, dustproof, rainproof. The oil coated stone uses the mechanical booth shop, when spreads the shop, strictly carries on according to the working instruction, controls the good booth shop temperature, the finished thickness and the booth shop speed, should conform to smoothness after the paver booth shop and the preliminary compaction booth layer, 横坡度 the stipulation request.
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询