关于一道成本会计的题目
Acompanyusesabsorptioncostingwithapredeterminedhourlyoverheadabsorptionrate.Thefollow...
A company uses absorption costing with a predetermined hourly overhead absorption rate. The following situations arose last month:
(i) Actual hours worked exceeded planned hours.
(ii) Actual overhead expenditure exceeded planned expenditure.
Which of the following statements is correct
A Situation (i) would cause overheads to be over absorbed and situation (ii) would cause overheads to be under absorbed.
B Situation (i) would cause overheads to be under absorbed and situation (ii) would cause overheads to be over absorbed.
C Both situations would cause overheads to be over absorbed.
D Both situations would cause overheads to be under absorbed.
答案是A为什么 展开
(i) Actual hours worked exceeded planned hours.
(ii) Actual overhead expenditure exceeded planned expenditure.
Which of the following statements is correct
A Situation (i) would cause overheads to be over absorbed and situation (ii) would cause overheads to be under absorbed.
B Situation (i) would cause overheads to be under absorbed and situation (ii) would cause overheads to be over absorbed.
C Both situations would cause overheads to be over absorbed.
D Both situations would cause overheads to be under absorbed.
答案是A为什么 展开
3个回答
展开全部
怎么跟你是说呢?你是学ACCA的吧,我也是,这是F2里面的一道题目吗?估计是的,我用个通俗点的说法来跟你说吧,关于工作时间来说也就是你的员工做的多了,他的产量也就相应的增加了对于工作时间这些如果超出了budget这个可以算是好的是favorable,但是对于费用这些如果超出了budget的话这些就是adverse。相应的对应下来的话在工作时间超出的话就算是over-absorbed,但是在费用上就是under-absorbed了。