高手来翻译
newormodifiedpartsthatarebeingshippedforF1orpilotvehiclebuilds.Foradditionalinformati...
new or modified parts that are being shipped for F1 or pilot vehicle builds. For additional information, refer to
P & S Quality Management System Procedure, PSSP0107, Pre-Production Sample Report.
Pre-Source Package: A document issued to formally designate and define program scope and
requirements to a potential production supplier. For additional information, refer to DaimlerChrysler P&S
Quality Management System Procedure, PSSP0007, Pre-Source Package.
P&S: DaimlerChrysler Procurement and Supply organization
Production Parts and Production Samples: Production Parts are manufactured at the production site using
production tooling, gauging, processes, materials, operators, environment, and process settings, e.g.
production feeds/speeds/cycle times/pressures/temperatures. Production Samples are production parts taken
from a significant production run. Refer to the "Production Part Approval Process" manual.
PPAP: Production Part Approval Process is a process for North American Original Equipment
Manufacturers (adopted by DCC, Ford, and General Motors) to simplify and standardize Chrysler Group
approval of initial samples. At DaimlerChrysler the PPAP process replaces ISIR/ISLR sample submission
requirements. Parts must be dimensionally, functionally, and materially correct, produced on production
tools, and manufactured to the final manufacturing process. For additional information, refer to the AIAG
Production Part Approval Process manual.
Production Validation (PV). Tests validating the production tooling, methods, and processes used to
manufacture a component. Tests must be performed by the supplier on parts representative of production
design configuration and made from production tooling. Parts shall be randomly selected from the full
production demonstration run of Process Sign-off. Parts shall be run at full line speed.
PPSR: Pre-production Sample Report. For additional information refer to P&S procedure PPSP0107
Quality: The totality of features and characteristics of a product that influence its ability to satisfy a user’s
needs.
Reliability: Probability that a component, assembly or system will:
-Operate as intended
-Under specified environmental and duty cycle conditions
-For a specified life, as measured in time, cycles, miles or other indicator of usage
S0 Build: Design Verification, first build item that is production released: parts may be soft or hard tooled,
production intent, production intent process in a pilot assembly facility.
S1 Build: Production Validation/ Pre-launch build
S2 Build: Production build
Supply Partner Information Network (SPIN): Computer network used to transmit part information between
the supplier and DaimlerChrysler systems through Extended Enterprise using a 3270 mainframe
connection. 展开
P & S Quality Management System Procedure, PSSP0107, Pre-Production Sample Report.
Pre-Source Package: A document issued to formally designate and define program scope and
requirements to a potential production supplier. For additional information, refer to DaimlerChrysler P&S
Quality Management System Procedure, PSSP0007, Pre-Source Package.
P&S: DaimlerChrysler Procurement and Supply organization
Production Parts and Production Samples: Production Parts are manufactured at the production site using
production tooling, gauging, processes, materials, operators, environment, and process settings, e.g.
production feeds/speeds/cycle times/pressures/temperatures. Production Samples are production parts taken
from a significant production run. Refer to the "Production Part Approval Process" manual.
PPAP: Production Part Approval Process is a process for North American Original Equipment
Manufacturers (adopted by DCC, Ford, and General Motors) to simplify and standardize Chrysler Group
approval of initial samples. At DaimlerChrysler the PPAP process replaces ISIR/ISLR sample submission
requirements. Parts must be dimensionally, functionally, and materially correct, produced on production
tools, and manufactured to the final manufacturing process. For additional information, refer to the AIAG
Production Part Approval Process manual.
Production Validation (PV). Tests validating the production tooling, methods, and processes used to
manufacture a component. Tests must be performed by the supplier on parts representative of production
design configuration and made from production tooling. Parts shall be randomly selected from the full
production demonstration run of Process Sign-off. Parts shall be run at full line speed.
PPSR: Pre-production Sample Report. For additional information refer to P&S procedure PPSP0107
Quality: The totality of features and characteristics of a product that influence its ability to satisfy a user’s
needs.
Reliability: Probability that a component, assembly or system will:
-Operate as intended
-Under specified environmental and duty cycle conditions
-For a specified life, as measured in time, cycles, miles or other indicator of usage
S0 Build: Design Verification, first build item that is production released: parts may be soft or hard tooled,
production intent, production intent process in a pilot assembly facility.
S1 Build: Production Validation/ Pre-launch build
S2 Build: Production build
Supply Partner Information Network (SPIN): Computer network used to transmit part information between
the supplier and DaimlerChrysler systems through Extended Enterprise using a 3270 mainframe
connection. 展开
1个回答
展开全部
新的或改良的部分,目前正在发运的F1或试验车辆基础. 更多资讯,请参阅至P &收盘质量管理体系程序, pssp0107 ,前期制作样本报告. 预包装来源:下发文件,正式划定,并确定项目的范围和要求,对潜在的生产供应商. 更多资讯,请参阅克莱斯勒磷&收盘质量管理体系程序, pssp0007 ,预包装来源. 磷&收盘:克莱斯勒的采购和供应组织生产零件和生产样品: 生产零部件的制造,在生产现场使用生产工装,计量,工艺,材料,操作,环境和进程设置, 例如: 饲料生产/速度/循环时间/压力/温度. 生产样品是生产零部件取自着生产运行. 指的是"生产部分核准程序"手册. ppap :生产部分审批过程北美原始设备制造商(通过裂解,福特 和通用汽车公司) ,以简化和规范克莱斯勒集团批准的初步样品. 在克莱斯勒的ppap过程取代isir /带状样品提交要求. 部件必须具有以下功能,而实质上正确的,产生的生产工具和生产的最后加工. 如需详细资讯,指的是生产aiag部分审批程序手册. 生产验证症( PV ) . 测试验证的生产工具,方法和程序,用以制造一个组成部分. 测试工作必须由供应商代表零部件生产设计,并配置了从生产工具. 部分均应随机抽取的全部生产示范运行过程中签署过的. 部分应每隔全线速度. 异丁烯:预生产报告样本. 更多信息请参阅至P &收盘程序ppsp0107质量: 总体特征和特性的产品,其影响力,以满足用户的需要. 可靠性:概率的一个组成部分,装配或系统: -经营本意是在特定环境和占空比条件对于一个特定的生活,以时间来衡量,周期宓 辅导或其他指标使用率为零建设:设计验证中,首先建立一个项目是生产释放:坝 垃圾转运站,可软或硬tooled ,生产意向,意图生产过程中的装配试验设施. 一建:生产验证/发射前S2的建设建立的,即:生产建设供应伙伴信息网(自旋) : 计算机网络用来传送部分之间的信息供应商和克莱斯勒制度,通过扩大企业用3270主机 连接.
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询