关于英语 翻译句子,谢谢

是英语的就找英语写就可以了,谢谢。1.s公司DIFF部DF(案子号)的案子,在上个星期做了管道的测量,这个案子管道长度为18.76m、直径为4inch的管,预算出我们的成... 是英语的就找英语写就可以了,谢谢。
1.s公司DIFF部DF(案子号)的案子,在上个星期做了管道的测量,这个案子管道长度为18.76m、直径为

4inch的管,预算出我们的成本为26美金,这个案子的成本已发送给销售员jeff,以供他做报价的动作。

2.s公司DIFF部DF(案子号)的加热袋案子,我们公司已经拿到了po,但是台湾制造端在生产的过程中对

elbow尺寸有一些顾虑。解决方案是,带上图纸到现场做一个对照,结果数据完全吻合。原因是,elbow的尺

寸是非标的。然后及时把正确数据发送到台湾,以继续生产。

3.s公司DIFF部DF(案子号)的案子,今天向客户做了报价的动作,报价金额为300美金

4.s公司DIFF部DF(案子号)的加热袋案子,controller的安装,controller上周就已经到上海了,只是客户的机

台一直在运行,未能安装。现与客户工程师联络过,与下周安装。具体时间未定。

5.计划下周二我和jeff去s公司diff部拜访工程师serena,主要是关于DF(案子号)案子的报价,及一些产品方面

的介绍。

6.去s公司,做两周一次的preventive maintenance.和上次的preventive maintenance报告交于客户工程师。
展开
 我来答
黄昏lian雪
2007-06-16 · TA获得超过1831个赞
知道小有建树答主
回答量:198
采纳率:0%
帮助的人:0
展开全部
1.s company DIFF Department DF (case) for the cases last week in a pipeline measurement, The case length of the pipeline 18.76 m, a diameter of the pipe 4inch. our budget, the cost of 26 dollars, the cost of the case has been sent to the sales staff jeff. for he has done Price movements. 2.s company DIFF Department DF (cases) of the heating bag case, our company has already earned a po, However, Taiwan's manufacturing production in the end of the process right elbow had some concerns about size. Solutions, brought drawings to the scene to do a comparison, the results of data exactly. The reason is that the size of non-elbow subject. Then promptly correct data sent to Taiwan to continue production. 3.s company DIFF Department DF (cases) cases, customers do today to the Price of actions Price amount of 300 dollars 4.s company DIFF Department DF (cases) of the heating bag lawsuit The controller installed last week on the controller has to Shanghai. only customers plant has been in operation, could not be installed. Engineers with the customer is contacted with the installation next week. ONGOING specific time. 5. I plan next Tuesday and jeff to the company's engineers called on the Ministry of diff serena, DF mainly on the (case) cases in the month, and some of the products introduced. 6. To the company's, do biweekly preventive maintenance. and the last preventión 've maintenance report for the customer engineers.
永Love远龙馬
2007-06-16
知道答主
回答量:40
采纳率:0%
帮助的人:0
展开全部
1.s Corporation DIFF DF (case number) the case, has made the pipeline survey in a on week, this case pipeline length is 18.76m, the diameter is
the 4inch tube, budgets our cost is 26 dollars, this case cost has transmitted for the seller jeff, by makes the quoted price for him the movement.
2.s Corporation DIFF DF (case number) the heating bag case, our company has already attained po, but the Taiwan manufacture end has some worries in the production
process to the elbow size.The solution is, takes to bring with the blueprint to make a comparison to the scene, finally the data tallies completely.The reason is, elbow ruler
inch right and wrong sign.Then transmits promptly the correct data Taiwan, continues to produce.
3.s Corporation DIFF DF (case number) the case, today made the quoted price movement to the customer, the quoted price amount was 300 dollar
4.s Corporation DIFF DF (case number) the heating bag case, the controller installment, controller last week on already arrived Shanghai, only was the customer machine
Taiwan is moving continuously, has not been able to install.Presently has contacted with customer engineer, installs with next week.The concrete time is undecided.

5. plans next Tuesday I and jeff go to s Corporation diff to visit Engineer serena, mainly is about DF (case number) the case quoted price, and some product aspect
introduction.
6. goes to s Corporation, makes fortnightly preventive maintenance. and previous time preventive the maintenance report hands over in customer engineer.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式