求以下文字的翻译
本文首先对隧道项目风险管理进行了概述,重点介绍了国内相关研究和管理现状。其次介绍了乔家山隧道项目的基本情况,重点叙述了本项目的地形、地貌及气候特点。第三,本文遵循项目风险...
本文首先对隧道项目风险管理进行了概述,重点介绍了国内相关研究和管理现状。其次介绍了乔家山隧道项目的基本情况,重点叙述了本项目的地形、地貌及气候特点。第三,本文遵循项目风险管理的研究思路,在参考了国内外许多相关研究成果的基础上,以乔家山隧道项目为例,提出隧道风险管理方面存在的问题,进行了乔家山隧道项目的风险识别、风险评估、风险应对、风险监控及风险后评估。具体地说,在第4章,本文对乔家山隧道项目的基本风险识别,在这基础上,识别出了68个基本风险因素,并构建了项目危险源统计表。然后利用LEC评价法对乔家山隧道项目进行评价,最后提出风险应对措施。
展开
3个回答
展开全部
This paper firstly summarizes the tunnel project risk management, introduces some related research and management of the status quo. Followed by the introduction of the Qiao mountain tunnel project's basic situation, mainly narrated this project terrain, the landform and the climate characteristic. In third, according to the research on project risk management train of thought, in reference to the many domestic and foreign related on the basis of research results, with Qiao mountain tunnel project as an example, presents tunnel risk management problems, were the Qiao mountain tunnel project risk identification, risk assessment, risk, risk control and risk assessment. Specifically, in the fourth chapter, based on the basic Qiao mountain tunnel project risk identification, on this basis, identifies 68 basic risk factors, and construction of the project risk source statistics. Then by using the LEC evaluation method of Qiao mountain tunnel project evaluation, finally put forward the risk countermeasures.
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
The article begins by overviewing the tunnel project risk management, highlighting related research and management status in the country. This is followed by the a brief introduction of Qiaojieshan tunnel project, focusing on the landscape, landform and climate characteristics. Thirdly, the artical followed the study philosophy of project risk management research, based on broad reference of several related research results both home and oversea, using the example of Qiaojieshan project, the problems existing in tunnel risk management are raised, and risk identification, risk evaluation, risk response, risk monitoring and after-risk evaluation are carried out. In specific, in Chapter 4, the article identifies the basic risks in Qiaojieshan tunnel project, based on which 68 basic risk factors are identified, and a project danger source statistics table is developed. Then, LEC evaluation method is used to evaluate the Qiaojieshan tunnel project, and finally, corresponding reaction measures are proposed.
本回答被提问者采纳
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
This paper firstly summarizes the tunnel project risk management, introduces some related research and management of the status quo. Followed by the introduction of the Qiao mountain tunnel project's basic situation, mainly narrated this project terrain, the landform and the climate characteristic. In third, according to the research on project risk management train of thought, in reference to the many domestic and foreign related on the basis of research results, with Qiao mountain tunnel project as an example, presents tunnel risk management problems, were the Qiao mountain tunnel project risk identification, risk assessment, risk, risk control and risk assessment. Specifically, in the fourth chapter, based on the basic Qiao mountain tunnel project risk identification, on this basis, identifies 68 basic risk factors, and construction of the project risk source statistics. Then by using the LEC evaluation method of Qiao mountain tunnel project evaluation, finally put forward the risk countermeasures。