1,包装车间内墙贴瓷砖的工人已经进场,今日先安排两个工人进行弹线,明日开始贴瓷砖。2.张总提出成品仓库月台斜坡尽快搓面,甲方老包装车间马上将生产,甲方要从月台上叉车。王和...
1,包装车间内墙贴瓷砖的工人已经进场,今日先安排两个工人进行弹线,明日开始贴瓷砖。
2.张总提出成品仓库月台斜坡尽快搓面,甲方老包装车间马上将生产,甲方要从月台上叉车。王和煦回复说包装车间外墙抹灰结束后,才能抽调工人去进行施工。
3.杨工要求CLCC对现场抽烟的工人进行罚款,否则甲方将进行罚款。
4.祁经理提出CLCC尽快落实包装车间污水管外接事宜,CLCC王经理回复说今日上午外线管道完成放线后就开始外接。
5.祁经理提醒CLCC在进行道路施工时将给水井、污水井、雨水井都完成后再进行路面施工。 展开
2.张总提出成品仓库月台斜坡尽快搓面,甲方老包装车间马上将生产,甲方要从月台上叉车。王和煦回复说包装车间外墙抹灰结束后,才能抽调工人去进行施工。
3.杨工要求CLCC对现场抽烟的工人进行罚款,否则甲方将进行罚款。
4.祁经理提出CLCC尽快落实包装车间污水管外接事宜,CLCC王经理回复说今日上午外线管道完成放线后就开始外接。
5.祁经理提醒CLCC在进行道路施工时将给水井、污水井、雨水井都完成后再进行路面施工。 展开
1个回答
展开全部
1, tiled walls packing plant workers have admitted, two workers in today's first bomb-line arrangement, tiling tomorrow.
2 Zhang made the finished product warehouse platform as soon as possible rubbing the surface slope, the Party will produce the old packing plant immediately, from the Party on the platform truck. Wang said the genial reply after the end of wall plaster packing plant, workers can be deployed to carry out the construction.
3 Yang CLCC on-site work requires workers to smoke fine, otherwise the Party will be fine.
4. Qijing Li made CLCC packaging plant as soon as possible sewer external matters, CLCC outside this morning, Mr. Wang replied that the pipeline started after completion of external pay-off.
5. Qijing Li reminded CLCC during road construction will provide water wells, water wells, water wells after the completion of road construction.
2 Zhang made the finished product warehouse platform as soon as possible rubbing the surface slope, the Party will produce the old packing plant immediately, from the Party on the platform truck. Wang said the genial reply after the end of wall plaster packing plant, workers can be deployed to carry out the construction.
3 Yang CLCC on-site work requires workers to smoke fine, otherwise the Party will be fine.
4. Qijing Li made CLCC packaging plant as soon as possible sewer external matters, CLCC outside this morning, Mr. Wang replied that the pipeline started after completion of external pay-off.
5. Qijing Li reminded CLCC during road construction will provide water wells, water wells, water wells after the completion of road construction.
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询