1. Malfunction rate is high due to old-aged electrical systems.
2. The lack of electrical spare-parts has a serious effect on the normal production process.
3.So we need to revise our electrical system. This machine is PLC-controlled. PLC uses Omron CPM2A. The contact relay is a Siemens product. Connector plugs uses air plugs. For cooling, the electric box uses heat-exchange machine. Two electricians and I will be responsible for fixing this problem. If we do as planned, each of us working our part, the entire work can be completed within a month. The malfunction rate will be reduced, thus increasing productivity.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
百度网友33161af
2011-11-25 · TA获得超过2962个赞
知道答主
回答量:41
采纳率:0%
帮助的人:25.5万
展开全部
第一句:The electrical system of the aging, high failure rate.
第二句:A lot of electrical components that are not seriously affected the normal production of spare parts,
第三句:So the electric system reform. This machine is a PLC control, PLC Using OMRON CPM2A, contactor relay using Siemens products by air plugs, plug, electric box of heat exchanger for cooling, by me and two electrician is in charge of this project, as planned, each respect cooperates in place, less than a month is the end of all the work. Fault rate is reduced apparently, achieved good results.
追问
看出来了 google翻译

参考资料: 在线翻译~

已赞过 已踩过<
你对这个回答的评价是?
评论 收起
dx22dx
2011-11-25 · TA获得超过5596个赞
知道小有建树答主
回答量:1399
采纳率:50%
帮助的人:972万
展开全部
1.When the electrical system ages, the failure rate will be higher.
2.A lot of electrical components have no spare parts, which serious influences the regular production.
3. So we should reform the electrical system.This tool machine is controlled by PLC using omron CPM2A,Contactor relays are the Siemens products,air plugs are used as the joints,
the electricity boxes are cooled by the heat exchanger . I and other two electricians are responsible for this project.With a Well-designed plan and each respects cooperating perfectly in position,we completed all the work Less than a month. The result is that the failure rate reduces significantly, and the tool machine has gained good effects.
本回答被提问者采纳
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
河马的智慧无法
2011-11-25 · TA获得超过293个赞
知道答主
回答量:84
采纳率:0%
帮助的人:12.7万
展开全部
First statement: electric system aging, high failure rate
2. A lot of electrical components are no spare parts, the serious influence regular production.
3. So for its electric system reform. This tool machine is PLC control, PLC using omron CPM2A, contactor relays the Siemens products, in the joint air plug, electricity box with heat exchanger for cooling, by me and two electrician is responsible for the project, because of well-planned, each respects cooperate in place, less than a month and end all work. Failure rate reduced significantly, and have gained good effects.
追问
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
收起 更多回答(2)
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式