湖北高考英语阅读:求翻译 5

Intoday’sthrowawaysociety,dealingwiththecity’sgrowingmountainofwasteisanincreasingcha... In today’s throw away society, dealing with the city’s growing mountain of waste is an increasing challenge for the city council(市议会)。
Recently. Edinburgh is faced with the problem of disposing of(处理)about250,000 million tons of waster a year . Despite different ways to dispose of much of it in a green manner---largely through encouraging recycling---its aging facilities such as the Powderhall landfill do not have the ability to deal with it.
The European Union (EU) has issued a new policy, regulating how such mountains of waster are to be disposed of. The five councils (Edinburgh. East Lothian. West Lothian. Midlothian and Borders) face fine around $18million a year from 2013 it they don’t increase recycling levels and rely less on landfill. With this in mind, the councils got together with the idea of building a large incinerator plant (垃圾焚烧厂)to burn half of the waste produced in their districts. But the plan fell apart after the change of target levels by a new UK government waste policy which required that no more than 25% of the city’s waste should be disposed of in this way by 2025.
After the plan was abandoned, a private company which already transported millions of tons of the city’s waste by train to a landfill site near Dunbar offered an alternative solution when it suggested opening a huge waste site near Portobello.
Since Powderhall is supposed to close in 2015, it seemed necessary for the members of the Edinburgh Council to accept the suggestion. But soon they turned it down—after 700 local objections reached them—because it would have meant hundreds of lorries a day making loud noise through heavily populated areas.
That still leaves the council with a problem. By 2013, only 50% of 1995 levels of waste will be allowed to be sent to landfill. Even if recycling targets are met, there will still be a large amount of rubbish to be burnt up. Due to this, Edinburgh and Midlothian councils have now decided to work together to build an incinerator plant as time to find a solution is fast running out
展开
 我来答
茈笙挚瑷
2012-03-26
知道答主
回答量:8
采纳率:0%
帮助的人:3.3万
展开全部
在今天的扔掉社会,处理城市的增长堆积成山的电子垃圾是一个放大挑战为市议会(市议会)。最近。爱丁堡被面对处理的问题(处理)about250,000个百万吨废品一年。尽管不同的方式处理很的它在一个绿色manner---largely通过鼓励recycling---its变老设施例如于是他被带到玻特和堆填区做主题是以为自己不会处理它。欧洲联盟(欧洲联盟)发出了一个新政策,邪恶侵蚀,调节如何如此废品的山被处理。五评议会(爱丁堡。东洛锡安。西洛锡安。中洛锡安,边界)面对罚款围绕$18million一年从2013它他们唐't提高回收水平,依靠少在堆填区。

评议会得到连同思想建筑面积一个大焚烧炉植物(垃圾焚烧厂)烧伤废弃的产品的一半在他们的区。但是计划四分五裂以后的的变动的目标水平由一个新联合王国政府废弃的的政策——要求如此无
超过25%的城市的废物将被处理用这种方法由2025。在计划被放弃后,私人公司,传输吨的百万城市的废物乘火车一个垃圾填埋场附近邓巴提供一个选择的余地社群,当它建议公开的一个巨大废物现场近波托贝洛。自从于是他被带到玻特和被假设关闭2015,它似乎必要而隶属于爱丁堡评议会接受建议。但不久他们拒绝—以后的的700家当地异议到达他们—因为它应该意味着了数以百计的货车一天使响的噪音通过人口密集地区。如此还假期理事会同一个问题。由2013,只是50%的1995废物的水平会允许被送到堆填区。即使回收目标被满足,有会仍有接不可数名词垃圾被燃耗。由于这个,爱丁堡,中洛锡安评议会现在决定同在同一处工作建一个焚烧炉植物由于时间发现一个解快冲出
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式