请用土木工程专业英语翻译以下文字,急急急急急!(我帮我爸翻译)

池防腐要求:垫层采用(100mm厚C20混凝土),地坪以下池外表面采用(刷环氧沥青涂层厚度不小于500mm.300um);地坪以上及池内壁、池底粉环氧砂浆面层,做法见图集... 池防腐要求:垫层采用(100mm厚C20混凝土),地坪以下池外表面采用(刷环氧沥青涂层厚度不小于500mm.300um);地坪以上及池内壁、池底粉环氧砂浆面层,做法见图集: .
14. 上部结构防腐要求:EL+5.500以下范围的梁柱表面 粉环氧砂浆面层,做法见图集: .
.5. 本工程(设备基础)采用天然地基,详见设计图.
6. 本工程(水池)采用预应力混凝土管桩基础,桩基础持力层为(粉土(1D层))土层。
注意是专业英语,谢谢!速度啊,急着要用啊
展开
 我来答
andychewbj
2012-07-15 · TA获得超过5.9万个赞
知道大有可为答主
回答量:3.2万
采纳率:90%
帮助的人:1.4亿
展开全部
池防腐要求:垫层采用(100mm厚C20混凝土),地坪以下池外表面采用(刷环氧沥青涂层厚度不小于500mm.300um);地坪以上及池内壁、池底粉环氧砂浆面层,做法见图集:
Anticorrosion Requirement for the Pool: The bedding adopts C20 concrete of 100 mm thickness; exterior surface of the pool below the flooring is painted with a coating of bituminous epoxy not thinner than 300 um ( 数据有笔误?厚度不可能500mm);the exterior surface of the pool above the flooring, including the inner wall and bottom of the pool are painted with an epoxy mortar layer (refer to drawings for application methods).

14. 上部结构防腐要求:EL+5.500以下范围的梁柱表面 粉环氧砂浆面层,做法见图集:
14. Anticorrosion Requirement for the superstructure: The surface of the beam columns in the area below EL+5.500 are painted with a layer of epoxy mortar (refer to drawings for application method).

5. 本工程(设备基础)采用天然地基,详见设计图.
5.This project (foundation for equipment) adopts the natural foundation (refer to design drawings for details)

6. 本工程(水池)采用预应力混凝土管桩基础,桩基础持力层为(粉土(1D层))土层。
6. This project(water pool)adopts the pre-stressed concrete pipe pile foundation; the bearing stratum of the pile foundation is soil stratum (silt [1D layer]).

【英语牛人团】
Mr1in
2012-07-16 · TA获得超过100个赞
知道小有建树答主
回答量:370
采纳率:0%
帮助的人:231万
展开全部
Pool anti-corrosion requirements: the cushion uses (100mm C20 thick concrete ), the outer surface of a floor below the pool ( brush epoxy asphalt coating thickness not less than 500mm.300um ); floor above and the pool wall, the bottom of the pool powder surface layer of epoxy mortar, see Atlas: practice.
14 upper structure anticorrosion requirements: EL+5.500below the range of Liang Zhu on the surface of powder surface layer of epoxy mortar, see Atlas: practice.
The.5. project ( equipment ) using the natural foundation, detailed design.
6 the project ( pool ) the prestressed concrete pile foundation, pile foundation bearing stratum for ( silt soil layer (1D layer ) ).
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式