
计算下面各题,能简算的要简算:
(1)57.6/3.6+57.6/6.4(2)72*0.81+10.4(3)7.2*0.1*28.5(4)0.45*0.18*300(5)18.1*0.92+3.93(6...
(1)57.6/3.6+57.6/6.4
(2)72*0.81+10.4
(3)7.2*0.1*28.5
(4)0.45*0.18*300
(5)18.1*0.92+3.93
(6)3.76*0.25+25.8
(7)28.8/3.2-19.2/3.2
(8)2.5+7.5*(8.65-2.25) 展开
(2)72*0.81+10.4
(3)7.2*0.1*28.5
(4)0.45*0.18*300
(5)18.1*0.92+3.93
(6)3.76*0.25+25.8
(7)28.8/3.2-19.2/3.2
(8)2.5+7.5*(8.65-2.25) 展开
2个回答
展开全部
(1)57.6/3.6+57.6/6.4
=16+9
=25
(2)72*0.81+10.4
=58.32+10.4
=68.72
(3)7.2*0.1*28.5
=0.72*28.5
=20.52
(4)0.45*0.18*300
=0.081*300
=24.3
(5)18.1*0.92+3.93
=16.652+3.93
=20.583
(6)3.76*0.25+25.8
=0.94+25.8
=26.74
(7)28.8/3.2-19.2/3.2
=(28.8-19.2)/3.2
=9.6/3.2
=3
(8)2.5+7.5*(8.65-2.25)
=2.5+7.5*6.4
=2.5+48
=50.5
=16+9
=25
(2)72*0.81+10.4
=58.32+10.4
=68.72
(3)7.2*0.1*28.5
=0.72*28.5
=20.52
(4)0.45*0.18*300
=0.081*300
=24.3
(5)18.1*0.92+3.93
=16.652+3.93
=20.583
(6)3.76*0.25+25.8
=0.94+25.8
=26.74
(7)28.8/3.2-19.2/3.2
=(28.8-19.2)/3.2
=9.6/3.2
=3
(8)2.5+7.5*(8.65-2.25)
=2.5+7.5*6.4
=2.5+48
=50.5

2023-08-25 广告
"整定计算的工作步骤,大致如下:1.确定整定方案所适应的系统情况。2.与调度部门共同确定系统的各种运行方式。3.取得必要的参数与资料(保护图纸,设备参数等)。4.结合系统情况,确定整定计算的具体原则。5.进行短路计算。6.进行保护的整定计算...
点击进入详情页
本回答由北京埃德思远电气技术咨询有限公司提供
展开全部
(1)57.6/3.6+57.6/6.4
=16+9
=25
(2)72*0.81+10.4
=58.32+10.4
=68.72
(3)7.2*0.1*28.5
=0.72*28.5
=20.52
(4)0.45*0.18*300
=0.081*300
=24.3
(5)18.1*0.92+3.93
=16.652+3.93
=20.583
(6)3.76*0.25+25.8
=0.94+25.8
=26.74
(7)28.8/3.2-19.2/3.2
=(28.8-19.2)/3.2
=9.6/3.2
=3
(8)2.5+7.5*(8.65-2.25)
=2.5+7.5*6.4
=2.5+48
=50.5
=16+9
=25
(2)72*0.81+10.4
=58.32+10.4
=68.72
(3)7.2*0.1*28.5
=0.72*28.5
=20.52
(4)0.45*0.18*300
=0.081*300
=24.3
(5)18.1*0.92+3.93
=16.652+3.93
=20.583
(6)3.76*0.25+25.8
=0.94+25.8
=26.74
(7)28.8/3.2-19.2/3.2
=(28.8-19.2)/3.2
=9.6/3.2
=3
(8)2.5+7.5*(8.65-2.25)
=2.5+7.5*6.4
=2.5+48
=50.5
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询