急急,求高手帮忙翻译成英文,非常感谢!
1.2010年完成了HP-AS12/AS13等机种的RFQ,和Cable部分的设计;2.导入2’ndtooling76套,参与厂商端试模,试组,并协助厂商分析制程不良,解...
1.2010年完成了HP- AS12 / AS13等机种的RFQ,和Cable部分的设计;
2.导入2’nd tooling76套,参与厂商端试模,试组,并协助厂商分析制程不良,解决厂商备料问题点,处理厂内试产问题/测试问题,最终完成承认及签样动作. 展开
2.导入2’nd tooling76套,参与厂商端试模,试组,并协助厂商分析制程不良,解决厂商备料问题点,处理厂内试产问题/测试问题,最终完成承认及签样动作. 展开
1个回答
展开全部
1. Accomplish the RFQ and cable design of HP-AS12 and AS13 models;
2.Phase in 2'nd tooling 76 sets, help vendor about the new products's trial-run, assist them to anlysis the process failure issues, and solves the problems about incoming materials, deal with the issues about trial-production and test until achiving the approval of customer;
2.Phase in 2'nd tooling 76 sets, help vendor about the new products's trial-run, assist them to anlysis the process failure issues, and solves the problems about incoming materials, deal with the issues about trial-production and test until achiving the approval of customer;
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询