英语翻译机械方面的 急!!! 5

AfterpositioningalongtheX–andY–axes,rapidtraverseisperformedtopointR.Drillingisperfor... After positioning along the X– and Y– axes, rapid traverse is performed
to point R.
Drilling is performed from point R to point Z.
When point Z has been reached, cutting feed is performed to return to
point R.
Before specifying G85, use a miscellaneous function (M code) to rotate
the spindle.
When the G85 command and an M code are specified in the same block,
the M code is executed at the time of the first positioning operation. The
system then proceeds to the next drilling operation.
When K is used to specify the number of repeats, the M code is executed
for the first hole only; for the second and subsequent holes, the M code
is not executed.
When a tool length offset (G43, G44, or G49) is specified in the canned
cycle, the offset is applied at the time of positioning to point R.
展开
selinagerald
2012-09-26 · 超过11用户采纳过TA的回答
知道答主
回答量:22
采纳率:0%
帮助的人:14.3万
展开全部
因为不了解这是具体描述什么机床或设备的,以下译文仅作参考:
沿X轴和Y轴定位后,迅速旋转到R点。
从R点钻到Z点。
钻到Z点后,将进刀退回到R点。
在给出G85前,用辅助功能(代码M)旋转主轴。
若G85发出命令且代码M在同一块内给出时,则首次定位操作时同时执行代码M。系统将进行下一步钻孔操作。
当K用于指定重复次数时,仅在第一个孔时执行代码M;第二个及之后的孔不执行代码M。
若封闭循环中给出刀具长度校正(G43, G44或G49),定位到R点时需用到该校正。
woodenpaw12ca282
2012-09-26 · TA获得超过9717个赞
知道大有可为答主
回答量:6139
采纳率:23%
帮助的人:2093万
展开全部
必须发图纸过来,不然的话无法操作这个切割程序
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
ZDXGZY
2012-09-26
知道答主
回答量:20
采纳率:0%
帮助的人:5.8万
展开全部
以X轴和Y轴快速定位
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
Carolzhang321
2012-09-26
知道答主
回答量:28
采纳率:0%
帮助的人:4.6万
展开全部
这是什么机械啊,还是找有道和谷歌吧
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
收起 更多回答(2)
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式