求翻译…………………………
B.Thepowerqualityanalysis(PQA)istobeperformedatthepointoftestconnection(s)everythreey...
B. The power quality analysis (PQA) is to be performed at the point of test connection(s) every three years. The schedule may be planned such that circuits are analyzed at specific times within the three-year cycle, providing that all test circuits are evaluated within the three-year period. Local power conditions may require more frequent monitoring to assure power quality parameters are maintained.
The power quality analysis (PQA) is to be performed at the point of test connection(s) every three years.
主要是这一句 展开
The power quality analysis (PQA) is to be performed at the point of test connection(s) every three years.
主要是这一句 展开
6个回答
展开全部
你好!
B. The power quality analysis (PQA) is to be performed at the point of test connection(s) every three years. The schedule may be planned such that circuits are analyzed at specific times within the three-year cycle, providing that all test circuits are evaluated within the three-year period. Local power conditions may require more frequent monitoring to assure power quality parameters are maintained.
B .质量分析(排队)是执行在点测试连接()每三年。该时间表可能是计划等电路进行了分析在特定时间内的三年周期,提供所有的测试电路内的三年期评价。当地的条件可能需要更频繁的监测,保证电源质量参数的维护。
B. The power quality analysis (PQA) is to be performed at the point of test connection(s) every three years. The schedule may be planned such that circuits are analyzed at specific times within the three-year cycle, providing that all test circuits are evaluated within the three-year period. Local power conditions may require more frequent monitoring to assure power quality parameters are maintained.
B .质量分析(排队)是执行在点测试连接()每三年。该时间表可能是计划等电路进行了分析在特定时间内的三年周期,提供所有的测试电路内的三年期评价。当地的条件可能需要更频繁的监测,保证电源质量参数的维护。
参考资料: 望采纳!!!O(∩_∩)O
本回答被网友采纳
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
b .电能质量分析(qa)要执行的时候测试连接(s)每三年。
这个时间表可能计划这样的电路进行了分析在特定时间内的为期三年的周期,提供所有测试电路是评估在三年时间。
当地的电力状况可能需要更频繁的监控来保证电能质量参数维护。
纯手打,lz相信我是对的!
这个时间表可能计划这样的电路进行了分析在特定时间内的为期三年的周期,提供所有测试电路是评估在三年时间。
当地的电力状况可能需要更频繁的监控来保证电能质量参数维护。
纯手打,lz相信我是对的!
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
b .电能质量分析(qa)要执行的时候测试连接(s)每三年。这个时间表可能计划这样的电路进行了分析在特定时间内的为期三年的周期,提供所有测试电路是评估在三年时间。当地的电力状况可能需要更频繁的监控来保证电能质量参数维护。
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
B.电能质量分析排队是执行时测试每三年,这个时间表可能计划这样的电路进行了分析在特定时间内的为期三年的周期,提供所有测试电路是评估在三年时间。当地的电力状况可能需要更频繁的监控来保证电能质量参数维护。
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
电力质量分析(排队)是执行在点测试连 接每三年。你的进度计划,电路分析 在特定时间内的三年周期,提供所有的测 试电路电动车aluated在三年期。当地的条 件可能需要更多的频率的监测,保证电能 质量参数保持。
采纳吧
采纳吧
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询