求高手帮忙翻译下面的题目,谢谢, 机器翻译就不用了。
AheatingoilfirmgetsanewcustomeronJanuary11.Thefirm’spolicyistodeliverafulltankofoil(2...
A heating oil firm gets a new customer on
January 11. The firm’s policy is to deliver a full tank of oil(250) and then
refill the tank 10 days later. By noting the daily temperature fluctuations and
the amount of oil required by the customer on the first fill-up, the firm can
work out a delivery schedule for the driver who will be servicing the customer.
The firm wants to schedule the deliveries so that the customer’s tank never
drops below 50 gallons and also so the driver is not making any unnecessary
trips to merely top off the customer’s tank. The delivery schedule is to make
up through the end of March. 展开
January 11. The firm’s policy is to deliver a full tank of oil(250) and then
refill the tank 10 days later. By noting the daily temperature fluctuations and
the amount of oil required by the customer on the first fill-up, the firm can
work out a delivery schedule for the driver who will be servicing the customer.
The firm wants to schedule the deliveries so that the customer’s tank never
drops below 50 gallons and also so the driver is not making any unnecessary
trips to merely top off the customer’s tank. The delivery schedule is to make
up through the end of March. 展开
展开全部
加热油公司得到一个新客户
1月11日。公司的政策是把油加满,(250),然后
10天后,加油。通过记录每天的温度波动和
通过对第一填补客户所需的油量,该公司可以
解决了司机将服务客户的交货时间表。
该公司想如期交付,客户的坦克没有
低于50加仑,也使司机不做任何不必要的
只是顶了客户的坦克的旅行。交货时间是使
到3月底
1月11日。公司的政策是把油加满,(250),然后
10天后,加油。通过记录每天的温度波动和
通过对第一填补客户所需的油量,该公司可以
解决了司机将服务客户的交货时间表。
该公司想如期交付,客户的坦克没有
低于50加仑,也使司机不做任何不必要的
只是顶了客户的坦克的旅行。交货时间是使
到3月底
来自:求助得到的回答
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询