英语高手请进!!!

请帮忙翻译一下,不胜感激![在铁路运输中,除列车在车站到达、出发、通过及在区间内运行外,凡机车车辆进行一切有目的的移动,统称为调车。调车作业计划是规定列车如何解体、编组、... 请帮忙翻译一下,不胜感激!
[在铁路运输中,除列车在车站到达、出发、通过及在区间内运行外,凡机车车辆进行一切有目的的移动,统称为调车。调车作业计划是规定列车如何解体、编组、取送、甩挂等具体行动的计划,调车工作根据调车计划进行。调车作业计划由调车区长或车站调度员根据阶段计划的任务、到达确报和存车情况编制,并以调车作业通知单的格式下达给有关调车人员来执行。编制调车作业计划时应遵守有关规定,以保证调车作业安全。
关键词:调车钩;调车程;摘车钩;溜放钩]
展开
美好且仁慈的好汉04
2008-05-22 · TA获得超过259个赞
知道小有建树答主
回答量:187
采纳率:0%
帮助的人:0
展开全部
In railway transportation, in addition to the train arrived at the station, starting through the range and running, where locomotives and rolling stock for the purpose of all mobile, collectively known as the marshalling. Shunting operation plan is to require the dissolution of how to train, grouping, for delivery, such as rejection linked to specific action plans, marshalling work under the marshalling plan. Shunting operation plan from the head or marshalling station controllers in accordance with phase of the mission, arrived at that situation and the preparation of car and truck operations to transfer notice issued to the format of the marshalling staff to implement. Preparation for Operation Plan should comply with the requirement for vehicles to ensure operational safety.

key words : Coupler the car jounery Coupler Running hook
zhangyuanfan0
2008-05-22
知道答主
回答量:27
采纳率:0%
帮助的人:0
展开全部
In railway transportation, in addition to the train arrived at the station, starting through the range and running, where locomotives and rolling stock for the purpose of all mobile, collectively known as the marshalling. Shunting operation plan is to require the dissolution of how to train, grouping, for delivery, such as rejection linked to specific action plans,
key words : Coupler the car jounery Coupler Running hook
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式