急请帮助翻译成英文

4.1甲方要求比合同约定的工期提前竣工时,应征得乙方同意,并支付乙方因赶工采取的措施费用。4.2因甲方未按约定完成工作,影响工期,工期顺延。4.3因乙方责任,不能按期开工... 4.1 甲方要求比合同约定的工期提前竣工时,应征得乙方同意,并支付乙方因赶工采取的措施费用。

4.2 因甲方未按约定完成工作,影响工期,工期顺延。

4.3 因乙方责任,不能按期开工或中途无故停工,影响工期,工期不顺延,并赔偿甲方相应损失。

4.4 因设计变更或非乙方原因造成的停电、停水、停气及不可抗力因素影响,导致停工8小时以上,工期相应顺延。
展开
秋日的雾
2013-07-05 · 超过20用户采纳过TA的回答
知道答主
回答量:112
采纳率:0%
帮助的人:52.2万
展开全部
4.1 Party demanding than the contract completion ahead of schedule, shall obtain the consent of Party B and Party B to pay the costs of measures taken to rush.
 
4.2 Party A fails to agree due to complete its work, the impact duration, extension of time.
 
4.3 Party B liability can not be scheduled to start or halfway undue downtime, affect the duration, the duration is not extended, and compensation for consequential loss Party.
 
4.4 due to design changes or B causes power outages, water, gas stop and force majeure factors, led to more than 8 hours downtime, time shall be extended accordingly.
Sagesci
2025-02-12 广告
以下是一篇英文论文推荐翻译润色的示例:在学术研究领域,一篇高质量的英文论文往往能引发广泛的关注和讨论。对于寻求论文推荐与翻译润色的同仁们,我推荐关注国际知名学术期刊,如《Nature》和《Science》等,它们刊载的论文不仅内容前沿,而且... 点击进入详情页
本回答由Sagesci提供
简单草莓派
2013-07-05
知道答主
回答量:17
采纳率:0%
帮助的人:2.3万
展开全部
4.1 Party A than agreed in the contract of the project be completed, candidates
are Party B agrees to pay and Party B to catch up with the work measures.
4.2
the party is not in complete agreement, and deadlines, Deadlines extended.
4.3
the consultant's responsibility to not work as scheduled or half-way without
undue downtime impact deadlines, deadlines are not extended, and compensation
for party losses.
4.4 due to design changes or non-Party B caused the power
outage, suspension of water supply, gas and force majeure factors, downtime over
8 Hours Duration, extension.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式