
机械专业英语求翻译 急!
技术要求1.按JB/T10205-2000<<液压缸技术条件>>进行装配;2.按GB/T15622-1995液压缸试验方法试验;3.全部螺栓装配时涂粘接剂;4.检查接力器...
技术要求
1.按JB/T10205-2000<<液压缸技术条件>>进行装配;
2.按GB/T15622-1995液压缸试验方法试验;
3.全部螺栓装配时涂粘接剂;
4.检查接力器行程并作记录,两接力器行程差数不大于±1;
5.作油压试验,试验压力8.5MPa,时间15分钟,不得渗漏;
6.作接力器动作试验,要求动作灵活,试验油压0.3-0.5MPa;
7.做漏油试验,接力器缸与活塞的漏油应小于0.01L/s;
8.试验结束后,拆开接力器检查各摩擦面有无损伤;
9.检查锁定与接力器的协联动作。
万分感谢 展开
1.按JB/T10205-2000<<液压缸技术条件>>进行装配;
2.按GB/T15622-1995液压缸试验方法试验;
3.全部螺栓装配时涂粘接剂;
4.检查接力器行程并作记录,两接力器行程差数不大于±1;
5.作油压试验,试验压力8.5MPa,时间15分钟,不得渗漏;
6.作接力器动作试验,要求动作灵活,试验油压0.3-0.5MPa;
7.做漏油试验,接力器缸与活塞的漏油应小于0.01L/s;
8.试验结束后,拆开接力器检查各摩擦面有无损伤;
9.检查锁定与接力器的协联动作。
万分感谢 展开
1个回答
展开全部
Technical requirements
1. By JB/T10205-2000 <<hydraulic cylinder technology>> for assembly;
2. GB/T15622-1995 by hydraulic cylinder test pilot;
3. Bolt assembly when all the Tu bonding agent;
4. Relay-trip inspection and make a record, the two relay itinerary for the difference is less than ± 1;
5. For hydraulic test, test pressure of 8.5 MPa, time 15 minutes, not to leakage;
6. Relay for action to test for flexible action, the pilot hydraulic 0.3-0.5 MPa;
7. Leakage test done, relay cylinder and piston oil spill should be less than 0.01 L / s;
8. After the trial, open relay-check whether the friction surface damage;
9. Inspection and lock relay for the Federation action.
1. By JB/T10205-2000 <<hydraulic cylinder technology>> for assembly;
2. GB/T15622-1995 by hydraulic cylinder test pilot;
3. Bolt assembly when all the Tu bonding agent;
4. Relay-trip inspection and make a record, the two relay itinerary for the difference is less than ± 1;
5. For hydraulic test, test pressure of 8.5 MPa, time 15 minutes, not to leakage;
6. Relay for action to test for flexible action, the pilot hydraulic 0.3-0.5 MPa;
7. Leakage test done, relay cylinder and piston oil spill should be less than 0.01 L / s;
8. After the trial, open relay-check whether the friction surface damage;
9. Inspection and lock relay for the Federation action.
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询