麻烦英语达人帮忙翻译一下(翻译器翻译的请忽视)
shopdrawingworkisoutofscopeofthecontractor。however,ifthefabricationdrawingsshowninapp...
shop drawing work is out of scope of thecontractor。
however, if the fabrication drawings shownin appendix 8-4 as a sample are not sufficient for the contractor's fabricationwork,thecontractor shall consider the cost of further detail drawing work by thecontractor into their offer price 展开
however, if the fabrication drawings shownin appendix 8-4 as a sample are not sufficient for the contractor's fabricationwork,thecontractor shall consider the cost of further detail drawing work by thecontractor into their offer price 展开
3个回答
展开全部
施工图不列入承包商工作范围。
但如果制作图信息不足,无法让承包商正常加工的(例如附录8-4中的图),承包商应考虑将细化施工图而增加的成本列入报价中。
但如果制作图信息不足,无法让承包商正常加工的(例如附录8-4中的图),承包商应考虑将细化施工图而增加的成本列入报价中。
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
施工图脱离了承包人范围。 然而,假如生产图纸显示附录8 - 4个样品,对于承包商的制造起步是不够的,承包人应考虑更多的成本,请承包人到他们的报价地点详图工作