在线翻译(英译汉,在线等,晚11点前有效)

基于绕行系数的横向设施选址研究横向设施尤其是下穿通道的数量会影响到整条高等级公路的平均填土高度高低。为了有效降低路堤高度,合理横向设施密度和选址位置研究是非常必要的。本文... 基于绕行系数的横向设施选址研究

横向设施尤其是下穿通道的数量会影响到整条高等级公路的平均填土高度高低。为了有效降低路堤高度,合理横向设施密度和选址位置研究是非常必要的。本文首先基于最大绕行系数,确定拟建高速公路横向设施的影响范围,应为一沿道路延伸方向,距道路中心线的距离非等宽的带状区域。然后对影响范围内的人口及村镇密度、地方路网水网分布、地方社会经济水平、居民出行特征等横向设施设置密度的影响因素进行研究,并针对人行天桥或人行通道、汽耕通道或跨线桥密度两不同使用功能的通道类型分别建立密度函数,结合居民可忍受的最大绕行距离推算出通道的合理间距,并通过交通分配校核绕行系数,建立横向设施选址优化模型,最终确定拟建高速横向设施的设置密度和具体位置。
请不要直接贴在线翻译答案,如果答案较好可再追加100分
展开
╭★乖小孩▍
2008-11-15
知道答主
回答量:17
采纳率:0%
帮助的人:0
展开全部
Under cross-cutting facilities in particular through the number of channels will affect the entire high-grade highways, the average high and low filling height. In order to effectively reduce the high embankment, a reasonable density and location of facilities horizontal position research is essential. In this paper, based around the largest factor determining the proposed highway's impact on the scope of cross-cutting facilities, should be an extension of a road along the direction of the distance from the center of the road, and other non-wide strip of the region. 英文 -> 中文(简) 中文(简) -> 英文 中文(简) -> 中文(繁) 中文(繁) -> 中文(简) 中文(简) -> 日文 日文 -> 中文(简) 其他23种语言
阿拉伯文 保加利亚文 波兰语 朝鲜语 丹麦语 德语 俄语 法语 芬兰语 荷兰语 捷克语 克罗地亚文 罗马尼亚语 挪威语 葡萄牙语 日语 瑞典语 西班牙语 希腊语 意大利语 印度文 英语 中文(繁体) 中文(简体) → 阿拉伯文 保加利亚文 波兰语 朝鲜语 丹麦语 德语 俄语 法语 芬兰语 荷兰语 捷克语 克罗地亚文 罗马尼亚语 挪威语 葡萄牙语 日语 瑞典语 西班牙语 希腊语 意大利语 印度文 英语 中文(繁体) 中文(简体)
And then to the affected areas of towns and villages and population density, local network of water distribution network, local socio-economic level, residents travel characteristics of horizontal density facilities to study the impact of factors, and for pedestrian footbridges or pedestrian access, farming steam channel Bridge or the density of the use of two different features of each type of channel-building density function, combined with tolerable residents of the largest bypass channel from the estimated distance between the rational and check the distribution of traffic through the bypass factor, the establishment of cross-cutting facility location optimization model , To finalize the proposed high-speed horizontal density and set up facilities in the specific location.

参考资料: 自译

已赞过 已踩过<
你对这个回答的评价是?
评论 收起
克圣在20
2008-11-15 · TA获得超过402个赞
知道小有建树答主
回答量:240
采纳率:0%
帮助的人:118万
展开全部
Based on the horizontal coefficient bypass facility site search

Under cross-cutting facilities in particular through the number of channels will affect the entire high-grade highways, the average high and low filling height. In order to effectively reduce the high embankment, a reasonable density and location of facilities horizontal position research is essential. In this paper, based around the largest factor determining the proposed highway's impact on the scope of cross-cutting facilities, should be an extension of a road along the direction of the distance from the center of the road, and other non-wide strip of the region. And then to the affected areas of towns and villages and population density, local network of water distribution network, local socio-economic level, residents travel characteristics of horizontal density facilities to study the impact of factors, and for pedestrian footbridges or pedestrian access, farming steam channel Bridge or the density of the use of two different features of each type of channel-building density function, combined with tolerable residents of the largest bypass channel from the estimated distance between the rational and check the distribution of traffic through the bypass factor, the establishment of cross-cutting facility location optimization model , To finalize the proposed high-speed horizontal density and set up facilities in the specific location.
本回答被提问者采纳
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
545394208
2008-11-23 · 贡献了超过114个回答
知道答主
回答量:114
采纳率:0%
帮助的人:0
展开全部
Under cross-cutting facilities in particular through the number of channels will affect the entire high-grade highways, the average high and low filling height. In order to effectively reduce the high embankment, a reasonable density and location of facilities horizontal position research is essential. In this paper, based around the largest factor determining the proposed highway's impact on the scope of cross-cutting facilities, should be an extension of a road along the direction of the distance from the center of the road, and other non-wide strip of the region. And then to the affected areas of towns and villages and population density, local network of water distribution network, local socio-economic level, residents travel characteristics of horizontal density facilities to study the impact of factors, and for pedestrian footbridges or pedestrian access, farming steam channel Bridge or the density of the use of two different features of each type of channel-building density function, combined with tolerable residents of the largest bypass channel from the estimated distance between the rational and check the distribution of traffic through the bypass factor, the establishment of cross-cutting facility location optimization model , To finalize the proposed high-speed horizontal density and set up facilities in the specific location.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
环阳夏侯0J5
2008-11-15
知道答主
回答量:43
采纳率:0%
帮助的人:14.1万
展开全部
不知道对不对
Based on the horizontal coefficient bypass facility site search

Under cross-cutting facilities in particular through the number of channels will affect the entire high-grade highways, the average high and low filling height. In order to effectively reduce the high embankment, a reasonable density and location of facilities horizontal position research is essential. In this paper, based around the largest factor determining the proposed highway's impact on the scope of cross-cutting facilities, should be an extension of a road along the direction of the distance from the center of the road, and other non-wide strip of the region. And then to the affected areas of towns and villages and population density, local network of water distribution network, local socio-economic level, residents travel characteristics of horizontal density facilities to study the impact of factors, and for pedestrian footbridges or pedestrian access, farming steam channel Bridge or the density of the use of two different features of each type of channel-building density function, combined with tolerable residents of the largest bypass channel from the estimated distance between the rational and check the distribution of traffic through the bypass factor, the establishment of cross-cutting facility location optimization model , To finalize the proposed high-speed horizontal density and set up facilities in the specific location.

应该可以吧?
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
收起 更多回答(2)
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式