What kind of interesting work are other Civil Engineers doing right now?
I'm working on an excavation for a building that is part of a Physics Experiment. We blasted our way 80ft deep into granite. The hole is 300ft by 130ft or there abouts. We are currently installing Lots of untensioned and tensioned rock anchors. I work for the contractor who is doing the work.
Its very interesting project, but also very frustrating. The Engineering firm who designed the project is from Chicago, and they didn't send anyone to the site before they designed it, and they did a really piss poor job of exploration. The geology was nothing like they thought it would be (big surprise), but thats what happens when local engineers are not involved I guess. They had 20 bore holes drilled, for a 3 mile road and the building site. Then they changed the site layout so the final design was not even in one of the bore holes. They missed by 300 ft. We built them a 3 mile road to the site, and it was designed like a Chicago street, and not 3 miles of road floated over swamp. Even though there is a septic system for the building site, there design included a sanitary sewer, with concrete manholes and the works. It was fun because there is no sanitary sewer on ether side of the road.
Lazy engineering is a very very terrible thing to have to deal with.
I'm working on an excavation for a building that is part of a Physics Experiment. We blasted our way 80ft deep into granite. The hole is 300ft by 130ft or there abouts. We are currently installing Lots of untensioned and tensioned rock anchors. I work for the contractor who is doing the work.
Its very interesting project, but also very frustrating. The Engineering firm who designed the project is from Chicago, and they didn't send anyone to the site before they designed it, and they did a really piss poor job of exploration. The geology was nothing like they thought it would be (big surprise), but thats what happens when local engineers are not involved I guess. They had 20 bore holes drilled, for a 3 mile road and the building site. Then they changed the site layout so the final design was not even in one of the bore holes. They missed by 300 ft. We built them a 3 mile road to the site, and it was designed like a Chicago street, and not 3 miles of road floated over swamp. Even though there is a septic system for the building site, there design included a sanitary sewer, with concrete manholes and the works. It was fun because there is no sanitary sewer on ether side of the road.
Lazy engineering is a very very terrible thing to have to deal with.