1、本图仅供土建时参考2、线端预埋供水、蒸汽总管.具体方位见图示.管道出地面100-150mm处配装总阀.3、线内地基应用钢筋水泥制作,表面应用环氧树脂或花岗岩铺平。水平...
1、本图仅供土建时参考
2、线端预埋供水、蒸汽总管.具体方位见图示.管道出地面100-150mm处配装总阀.
3、线内地基应用钢筋水泥制作,表面应用环氧树脂或花岗岩铺平。水平误差≤4mm,承重≥5T/平方米详细见图纸
4、排水沟应环氧树脂防腐,排水沟向排水方向作2‰倾斜,线两端和线外地沟需加盖,车间内地面防腐由需方厂考虑。
5、设备动力采用三相五线 展开
2、线端预埋供水、蒸汽总管.具体方位见图示.管道出地面100-150mm处配装总阀.
3、线内地基应用钢筋水泥制作,表面应用环氧树脂或花岗岩铺平。水平误差≤4mm,承重≥5T/平方米详细见图纸
4、排水沟应环氧树脂防腐,排水沟向排水方向作2‰倾斜,线两端和线外地沟需加盖,车间内地面防腐由需方厂考虑。
5、设备动力采用三相五线 展开
3个回答
展开全部
1, this figure is only for reference in civil engineering
2, the water and steam line manager having seen here. Specific location. The ground 100-150mm pipe fittings in total valve.
3, inline foundation reinforced concrete application, application of epoxy resin or granite surface. Level than 4mm error, bearing the experiment.it 5-ton/m2 detailed see drawing
4 and drainage gutters, anticorrosive epoxy resin shall be made to the direction of drainage 0.2% tilt, line and line from the ditch, workshop floor by the buyer's factory. Anti-corrosion
Five, five line adopts three-phase power equipment
2, the water and steam line manager having seen here. Specific location. The ground 100-150mm pipe fittings in total valve.
3, inline foundation reinforced concrete application, application of epoxy resin or granite surface. Level than 4mm error, bearing the experiment.it 5-ton/m2 detailed see drawing
4 and drainage gutters, anticorrosive epoxy resin shall be made to the direction of drainage 0.2% tilt, line and line from the ditch, workshop floor by the buyer's factory. Anti-corrosion
Five, five line adopts three-phase power equipment
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
1.The drawing is just for reference in civil engineering.
2.General pipes and lines for water and gas have been laid.You can get it from the drawing.The main valve is set up on the 100-150mm high of the pips.
3.The lines foundation should be reinforced concrete ,with a surface laid by epoxy resin or granite.The horizontal error should be smaller than 4mm and the bearing should be more than 5t.You can get it from the drawing.
4.The drainage channel should be epoxy resin against corrosion.The drainage channel should be inclined by 2‰ to flow.The outlines and ends should be covered.The plant take charge of inner surface antisepsis.
5.The equipment power is three-phase five-line system.
2.General pipes and lines for water and gas have been laid.You can get it from the drawing.The main valve is set up on the 100-150mm high of the pips.
3.The lines foundation should be reinforced concrete ,with a surface laid by epoxy resin or granite.The horizontal error should be smaller than 4mm and the bearing should be more than 5t.You can get it from the drawing.
4.The drainage channel should be epoxy resin against corrosion.The drainage channel should be inclined by 2‰ to flow.The outlines and ends should be covered.The plant take charge of inner surface antisepsis.
5.The equipment power is three-phase five-line system.
本回答被提问者采纳
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
展开全部
1, this figure is only for reference in civil engineering
2, the water and steam line manager having seen here. Specific location. The ground 100-150mm pipe fittings in total valve.
3, inline foundation reinforced concrete application, application of epoxy resin or granite surface. Level than 4mm error, bearing the experiment.it 5-ton/m2 detailed see drawing
4 and drainage gutters, anticorrosive epoxy resin shall be made to the direction of drainage 0.2% tilt, line and line from the ditch, workshop floor by the buyer's factory. Anti-corrosion
Five, five line adopts three-phase power equipment
********************************************************************
采纳吧
2, the water and steam line manager having seen here. Specific location. The ground 100-150mm pipe fittings in total valve.
3, inline foundation reinforced concrete application, application of epoxy resin or granite surface. Level than 4mm error, bearing the experiment.it 5-ton/m2 detailed see drawing
4 and drainage gutters, anticorrosive epoxy resin shall be made to the direction of drainage 0.2% tilt, line and line from the ditch, workshop floor by the buyer's factory. Anti-corrosion
Five, five line adopts three-phase power equipment
********************************************************************