在SD模块中replenishment lead time 究竟起什么作用?拜托各位了 3Q

开始学习sd模块,当看到scm600-sd的availabilitycheck章节的时候,对replenishmentleadtime的时候,没有详细的的给出解释,对于其... 开始学习sd模块,当看到scm600-sd的availability check章节的时候,对replenishment lead time 的时候,没有详细的的给出解释,对于其作用也不是很了解,望各位帮忙解释一下 展开
 我来答
磨睦啊9305
2014-04-21 · 超过58用户采纳过TA的回答
知道答主
回答量:111
采纳率:100%
帮助的人:109万
展开全部
Replenishment lead time is the time needed to produce the request stock. It can comprise the time taken by the business to produce a material or the time taken to externally procure the material form a vendor. This includes the goods receipting time. Thus the replenishment lead time is the time taken for the material to become available. RLT is only used when doing an ATP check.The value of RLT for a material is specified on the material master record. It may be determined in one of two ways:The RLT for an externally procured material is determined base on the total processing time for purchasing, the planned delivery time and GR processing time. These setting may by made on the purchasing and MRP 2 views of the material master record.The RLT for an internally procured material is based on the in-house production time, seen on the MRP2 view as well as the GR processing time or alternatively if set, from the total replenishment lead time, which is found in the material master record on the MPR3 view.If a sales order is created and there is no availability stock and the ATP check is set to include RLT, the system will automatically confirm the desired quantity for the end of RLT based on whether the material is externally or internally procured. 查看原帖>>
大舒281
2014-04-20 · TA获得超过107个赞
知道答主
回答量:193
采纳率:0%
帮助的人:60.5万
展开全部
Replenishment lead time is the time needed to produce the request stock. It can comprise the time taken by the business to produce a material or the time taken to externally procure the material form a vendor. This includes the goods receipting time. Thus the replenishment lead time is the time taken for the material to become available. RLT is only used when doing an ATP check.The value of RLT for a material is specified on the material master record. It may be determined in one of two ways:The RLT for an externally procured material is determined base on the total processing time for purchasing, the planned delivery time and GR processing time. These setting may by made on the purchasing and MRP 2 views of the material master record.The RLT for an internally procured material is based on the in-house production time, seen on the MRP2 view as well as the GR processing time or alternatively if set, from the total replenishment lead time, which is found in the material master record on the MPR3 view.If a sales order is created and there is no availability stock and the ATP check is set to include RLT, the system will automatically confirm the desired quantity for the end of RLT based on whether the material is externally or internally procured.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式