TheCodeandStandardappliedineachcaseshallbethelatestrevisionadoptedandpublishedattheBi...
The Code and Standard applied in each case shall be the latest revision adopted and published at the Bid closing date. Any conflict between different applicable Standards and Codes shall be referred to the Owner’s Engineer who will determine which shall govern and the Owner’s Engineer's decision will be final.
Alternative internationally recognized Codes and Standards such as DIN, BS, JIS, etc. are acceptable. The Bidder shall state in his Bid the Codes and Standards which are not in conformance with the Bid Document requirements together with a statement that in the Bidder's opinion the alternatives are equivalent or superior to those specified. If, during the evaluation period, the Owner’s Engineer has reasons to doubt the adequacy of alternatively proposed Codes and Standards, the Owner’s Engineer may request to substantiate that Bidder's proposed Codes and Standards are equivalent or superior to those specified.
The Contractor shall provide at no extra costs two (2) sets of all Codes and Standards, which will form the design basis for his plant and equipment. These Codes and Standards shall be submitted in the English language and latest at the time they are referred to by documents submitted to the Owner’s Engineer for design review.
If Codes and Standards other than those specified in the Bid Document are finally accepted, the Contractor shall submit an index tabulating the accepted Codes and Standards against the specified ones. Additionally the major differences between the accepted and withdrawn Codes and Standards shall be summarized.
No purchasing, fabrication or manufacture shall proceed until the Codes and Standards are approved in writing by the Owner’s Engineer. 展开
Alternative internationally recognized Codes and Standards such as DIN, BS, JIS, etc. are acceptable. The Bidder shall state in his Bid the Codes and Standards which are not in conformance with the Bid Document requirements together with a statement that in the Bidder's opinion the alternatives are equivalent or superior to those specified. If, during the evaluation period, the Owner’s Engineer has reasons to doubt the adequacy of alternatively proposed Codes and Standards, the Owner’s Engineer may request to substantiate that Bidder's proposed Codes and Standards are equivalent or superior to those specified.
The Contractor shall provide at no extra costs two (2) sets of all Codes and Standards, which will form the design basis for his plant and equipment. These Codes and Standards shall be submitted in the English language and latest at the time they are referred to by documents submitted to the Owner’s Engineer for design review.
If Codes and Standards other than those specified in the Bid Document are finally accepted, the Contractor shall submit an index tabulating the accepted Codes and Standards against the specified ones. Additionally the major differences between the accepted and withdrawn Codes and Standards shall be summarized.
No purchasing, fabrication or manufacture shall proceed until the Codes and Standards are approved in writing by the Owner’s Engineer. 展开
2个回答
展开全部
守则和标准适用于每一种情况下,应采取的最新版本,并在投标截止日期公布。不同的适用之间的任何标准和规范的冲突应提交给业主,星光大道工程师将确定谁应管理和业主,政务主任工程师的决定将是最终决定。
国际公认的替代如DIN,英国BS,JIS等是可以接受的规范和标准。投标人应当在投标的规范和标准的不符合招标文件的要求的一致性与共同声明,在投标人的意见,选择是相当于或优于这些指定的。如果在评估期间,业主,政务主任工程师有理由怀疑充足或者提出规范与标准,业主,政务主任工程师可以要求投标人证实,提出的规范和标准是等同或优于这些指定的。
承包商应提供无两(2)所有守则及标准,这将成为他的工厂和设备设计的基础上套的额外费用。这些准则和标准应当报送的英语和最近在他们被称为设计审查通过提交给业主,政务主任工程师文件的时间。
如果规范与标准比在投标文件规定的其他最终接受,承包商应提交一份指数制表针对指定的公认的规范和标准。此外之间的接受和撤回规范和标准应当做到重大分歧总结。
不采购,制造或生产应继续,直到规范与标准,都是由业主,政务主任工程师书面批准。
国际公认的替代如DIN,英国BS,JIS等是可以接受的规范和标准。投标人应当在投标的规范和标准的不符合招标文件的要求的一致性与共同声明,在投标人的意见,选择是相当于或优于这些指定的。如果在评估期间,业主,政务主任工程师有理由怀疑充足或者提出规范与标准,业主,政务主任工程师可以要求投标人证实,提出的规范和标准是等同或优于这些指定的。
承包商应提供无两(2)所有守则及标准,这将成为他的工厂和设备设计的基础上套的额外费用。这些准则和标准应当报送的英语和最近在他们被称为设计审查通过提交给业主,政务主任工程师文件的时间。
如果规范与标准比在投标文件规定的其他最终接受,承包商应提交一份指数制表针对指定的公认的规范和标准。此外之间的接受和撤回规范和标准应当做到重大分歧总结。
不采购,制造或生产应继续,直到规范与标准,都是由业主,政务主任工程师书面批准。
展开全部
以下是小弟的答案,希望可以帮到您。
守则和标准适用于每一种情况下,应采取的最新版本,并在投标截止日期公布。不同的适用之间的任何标准和规范的冲突应提交给业主,星光大道工程师将确定谁应管理和业主,政务主任工程师的决定将是最终决定。
国际公认的替代如DIN,英国BS,JIS等是可以接受的规范和标准。投标人应当在投标的规范和标准的不符合招标文件的要求的一致性与共同声明,在投标人的意见,选择是相当于或优于这些指定的。如果在评估期间,业主,政务主任工程师有理由怀疑充足或者提出规范与标准,业主,政务主任工程师可以要求投标人证实,提出的规范和标准是等同或优于这些指定的。
承包商应提供无两(2)所有守则及标准,这将成为他的工厂和设备设计的基础上套的额外费用。这些准则和标准应当报送的英语和最近在他们被称为设计审查通过提交给业主,政务主任工程师文件的时间。
如果规范与标准比在投标文件规定的其他最终接受,承包商应提交一份指数制表针对指定的公认的规范和标准。此外之间的接受和撤回规范和标准应当做到重大分歧总结。
不采购,制造或生产应继续,直到规范与标准,都是由业主,政务主任工程师书面批准。
守则和标准适用于每一种情况下,应采取的最新版本,并在投标截止日期公布。不同的适用之间的任何标准和规范的冲突应提交给业主,星光大道工程师将确定谁应管理和业主,政务主任工程师的决定将是最终决定。
国际公认的替代如DIN,英国BS,JIS等是可以接受的规范和标准。投标人应当在投标的规范和标准的不符合招标文件的要求的一致性与共同声明,在投标人的意见,选择是相当于或优于这些指定的。如果在评估期间,业主,政务主任工程师有理由怀疑充足或者提出规范与标准,业主,政务主任工程师可以要求投标人证实,提出的规范和标准是等同或优于这些指定的。
承包商应提供无两(2)所有守则及标准,这将成为他的工厂和设备设计的基础上套的额外费用。这些准则和标准应当报送的英语和最近在他们被称为设计审查通过提交给业主,政务主任工程师文件的时间。
如果规范与标准比在投标文件规定的其他最终接受,承包商应提交一份指数制表针对指定的公认的规范和标准。此外之间的接受和撤回规范和标准应当做到重大分歧总结。
不采购,制造或生产应继续,直到规范与标准,都是由业主,政务主任工程师书面批准。
已赞过
已踩过<
评论
收起
你对这个回答的评价是?
推荐律师服务:
若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询