请翻译成中文,谢谢!!(不要软件翻译)

5RiskDefinitionAsdiscussedintheprevioussection,wefoundthateachcauseofriskscanbecatego... 5 Risk Definition
As discussed in the previous section, we found that each cause of risks can be categorized in either the cause related to project components or fundamental causes of risks. This fact was found from analysis on the causes of risks by using the affinity diagram. There are some differences in definitions of risk among research areas. For example, AS/NZS 4360[5] defines risks as “the chance of something happening that will have an impact upon objectives. It is measured in terms of consequences and likelihood”, and ISO/IEC Guide 73[6] defines risks as “Risk can be defined as the combination of the probability of an event and its consequences”.
These definitions tell us that probabilities and consequences are important factors when we describe certain risks. On the other hand, the risk descriptions used in this research have no description on its probabilities and consequences. But risk analysis and evaluation are normally performed after risk identification process, and probabilities and consequences are evaluated in those processes. Therefore probabilities and consequence don’t have to be described in the risk identification process.
generated risks are limited.
展开
织起梦的袋子
2011-06-13
知道答主
回答量:19
采纳率:0%
帮助的人:0
展开全部
5风险的定义
正如上一节讨论的,我们发现每个风险的原因可以无论是在有关项目的组件或根本原因造成的风险分类。这个外交事务委员会
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式