Thepowertake-offtestwillbemadeconsistingofatwohourtestatthemaximumpowerspecifiedbythe...
The power take-off test will be made consisting of a two hour test at the maximum power specified by the manufacture with a 20 per cent increase in torque applied every five minutes for a period not exceeding one minute. If the engine does not develop the 20 per cent increase in torque the intermittent overload shall be carried out at maximum engine torque. This fact shall be noted in the test report. In either case the maximum power take-off power reported for the two-hour test will be that specified by the manufacturer.
Non-mechanical coupling between engine and power take-off
This will be the case of a fluid or electrical power transmission system with its possible cooling component. The following test conditions and procedures shall apply.
In addition to those required under 4.1.4.1 above, a means shall be provided for measuring the temperature of any non-mechanical components which couple the engine to the power take-off system.
Test procedure
The governor control level being set for maximum power, the system shall be operated at maximum power take-off power for a period sufficient to establish stabilised conditions but not less than two hours. The power take-off system shall be considered stable when two consecutive temperature readings of the cooling device taken 10 minutes apart do not differ by more than 1度
The tractor shall then operate for a period of one hour. The maximum power quoted in the report shall be the average of minimum number of six readings to be evenly spread. If the power take-off or the engine speed deviates by more than 2 percent from the standard power take-off speed or calculated average speed respectively, the test shall be repeated. If the variation continues, the deviation shall be stated in the report. The temperature observed at the critical components of the system shall also be recorded.
A second one-hour test shall be made at the power take-off power level observed above and at the lowest engine speed which will maintain this power at the rated power take-off speed.
A third series of tests shall determine power take-off power at part loads with the governor control set as for the second test. Each test shall last at least 20 minutes and shall be made according to 4.1.1 above.
Performance at the belt or the belt pulley shaft
Test requirements
The tractor pulley shall be connected to that of the dynamometer bench by a belt. This belt shall be flexible and have appropriate power and torque transmission characteristics. Belt slip shall not exceed 2 percent and the necessary tension to obtain this condition shall be as small as possible.
The tests at the pulley shaft shall be conducted by directly coupling the tractor pulley to the dynamometer shaft.
All of the provisions for tests at the main power take-off sha apply to the belt tests and to the pulley shaft tests, with the exception of those at standard power take-off speed and for tractors unable to transmit the full engine power at the power take-off.
If the engine speed recommended by the manufacturer for tests at maximum power does not correspond to a standard belt speed, the operational characteristics of the engine at the speed corresponding to the standard belt speed shall be measured during the full load test.
Test results
The power, belt slip, hourly fuel consumption and specific fuel consumption in relation to engine speed shall be recorded, as in the main power take-off test.
Performance in a hot atmosphere
Test requirements 展开
Non-mechanical coupling between engine and power take-off
This will be the case of a fluid or electrical power transmission system with its possible cooling component. The following test conditions and procedures shall apply.
In addition to those required under 4.1.4.1 above, a means shall be provided for measuring the temperature of any non-mechanical components which couple the engine to the power take-off system.
Test procedure
The governor control level being set for maximum power, the system shall be operated at maximum power take-off power for a period sufficient to establish stabilised conditions but not less than two hours. The power take-off system shall be considered stable when two consecutive temperature readings of the cooling device taken 10 minutes apart do not differ by more than 1度
The tractor shall then operate for a period of one hour. The maximum power quoted in the report shall be the average of minimum number of six readings to be evenly spread. If the power take-off or the engine speed deviates by more than 2 percent from the standard power take-off speed or calculated average speed respectively, the test shall be repeated. If the variation continues, the deviation shall be stated in the report. The temperature observed at the critical components of the system shall also be recorded.
A second one-hour test shall be made at the power take-off power level observed above and at the lowest engine speed which will maintain this power at the rated power take-off speed.
A third series of tests shall determine power take-off power at part loads with the governor control set as for the second test. Each test shall last at least 20 minutes and shall be made according to 4.1.1 above.
Performance at the belt or the belt pulley shaft
Test requirements
The tractor pulley shall be connected to that of the dynamometer bench by a belt. This belt shall be flexible and have appropriate power and torque transmission characteristics. Belt slip shall not exceed 2 percent and the necessary tension to obtain this condition shall be as small as possible.
The tests at the pulley shaft shall be conducted by directly coupling the tractor pulley to the dynamometer shaft.
All of the provisions for tests at the main power take-off sha apply to the belt tests and to the pulley shaft tests, with the exception of those at standard power take-off speed and for tractors unable to transmit the full engine power at the power take-off.
If the engine speed recommended by the manufacturer for tests at maximum power does not correspond to a standard belt speed, the operational characteristics of the engine at the speed corresponding to the standard belt speed shall be measured during the full load test.
Test results
The power, belt slip, hourly fuel consumption and specific fuel consumption in relation to engine speed shall be recorded, as in the main power take-off test.
Performance in a hot atmosphere
Test requirements 展开
展开全部
起飞功率测试将包括在由每20扭矩增加应用每五分钟为时间不超过一分钟的制造商指定的最大功率一二小时测试。如果发动机不发展20个百分点增加扭矩间歇超载应在发动机的最大扭矩进行。这一事实应记录在测试报告。在这两种情况下的最大功率输出功率报告两小时的考试将由生产商指定的。非机械耦合之间的发动机和动力offthis将流体或电气与可能的冷却元件的电力传输系统的情况下。下面的测试条件和程序办理。除了那些在4.1.4.1以上的要求,一个应设有测量任何非机械部件,对发动机的动力输出系统的温度。测试程序的调速器控制水平集的最大功率,系统应在一段足以建立稳定的条件,但不少于两个小时的最大功率输出功率操作。动力输出系统应考虑稳定时的冷却装置10分钟连续两个温度读数间隔不超过1度拖拉机将运行一段一个小时不同。最大功率引述报告应至少六的读数是均匀分布的平均数。如果电源起飞或发动机转速偏离超过从标准电源起飞速度或计算的平均速度为百分之2,测试应重复。如果变化仍在继续,其偏差应在报告中注明。温度观测系统的重要组成部分也应被记录。第二个小时的试验应在动力输出功率电平以上观察和最低的发动机速度将保持这种功率在额定功率的起飞速度。三分之一系列测试应确定与调速器控制设置为第二个测试部分负荷的电力输出功率。每次试验应持续至少20分钟,应根据4.1.1以上。在皮带或皮带轮和滑轮轴测试拖拉机性能应连接到一个带的台架。该带应灵活,有适当的功率和扭矩传递特性。带滑移不得超过百分之2和必要的张力来获得这种情况下应尽可能小。
在滑轮轴试验必须由拖拉机轮直接连接到测力计轴进行。所有的主要动力输出沙试验的规定适用于皮带和滑轮轴试验测试,在标准功率起飞速度和牵引车无法在发射功率的发动机最大功率take-off.if由制造商推荐的最大功率时的转速试验不符合标准的皮带速度的异常,在发动机转速相应标准的带速度应满负荷试验中测得的操作特性。试验结果的力量,皮带打滑,与发动机转速小时耗油量和燃油消耗量应被记录,作为主要动力输出测试。在一个炎热的atmospheretest性能要求
在滑轮轴试验必须由拖拉机轮直接连接到测力计轴进行。所有的主要动力输出沙试验的规定适用于皮带和滑轮轴试验测试,在标准功率起飞速度和牵引车无法在发射功率的发动机最大功率take-off.if由制造商推荐的最大功率时的转速试验不符合标准的皮带速度的异常,在发动机转速相应标准的带速度应满负荷试验中测得的操作特性。试验结果的力量,皮带打滑,与发动机转速小时耗油量和燃油消耗量应被记录,作为主要动力输出测试。在一个炎热的atmospheretest性能要求
展开全部
希望给与最佳答案 谢谢和合作
起飞测试将包括在最大功率的制造与应用每五分钟为一个周期不超过一分钟的扭矩增加20%,在两个小时的测试。如果发动机不发展增加20%的扭矩间歇过载,应进行发动机的最大扭矩。在测试报告中应注意这一事实。在这两种情况下的最大功率,起飞功率两个小时的测试报告将是制造商指定的。
非机械起飞的引擎和动力之间的耦合
这将是其可能的冷却组件的流体或电力传输系统的情况下。下面的测试条件和程序应适用。
除了4.1.4.1上述规定的那些,应提供一种手段,用于测量温度的任何非机械部件的发动机的功率起飞系统耦合。
测试程序
级别设置为最大功率的调速器控制,系统应工作在最大功率起飞功率足够长的时间,建立稳定的条件,但不少于两小时。起飞的电源系统应被视为稳定时连续两次10分钟的冷却装置的温度读数相差不超过1度
然后操作拖拉机应为一小时的期间。在报告中引用的最大功率应的平均最低数量的六个读数均匀地涂抹。如果电源起飞或发动机转速偏差超过2%的标准电源起飞速度或计算平均速度分别,应重复测试。如果变化,偏差应在报告中表示。温度观测系统的重要组成部分,也应记录下来。
第二个1小时的测试应在电源起飞功率水平和最低的发动机速度,这将保持这种权力,在额定功率起飞速度。
第三个系列的测试将确定在部分负载的功率起飞功率的调速器设置为第二个测试。每次试验应持续至少20分钟,并应按照4.1.1以上。
在皮带或皮带轮轴的性能
试验要求。
拖拉机皮带轮应通过皮带连接到测功机板凳。这一带应是灵活的,并有适当的功率和扭矩传输特性。皮带打滑,不得超过2%,必要的张力,得到此条件下,应尽可能的小。
起飞测试将包括在最大功率的制造与应用每五分钟为一个周期不超过一分钟的扭矩增加20%,在两个小时的测试。如果发动机不发展增加20%的扭矩间歇过载,应进行发动机的最大扭矩。在测试报告中应注意这一事实。在这两种情况下的最大功率,起飞功率两个小时的测试报告将是制造商指定的。
非机械起飞的引擎和动力之间的耦合
这将是其可能的冷却组件的流体或电力传输系统的情况下。下面的测试条件和程序应适用。
除了4.1.4.1上述规定的那些,应提供一种手段,用于测量温度的任何非机械部件的发动机的功率起飞系统耦合。
测试程序
级别设置为最大功率的调速器控制,系统应工作在最大功率起飞功率足够长的时间,建立稳定的条件,但不少于两小时。起飞的电源系统应被视为稳定时连续两次10分钟的冷却装置的温度读数相差不超过1度
然后操作拖拉机应为一小时的期间。在报告中引用的最大功率应的平均最低数量的六个读数均匀地涂抹。如果电源起飞或发动机转速偏差超过2%的标准电源起飞速度或计算平均速度分别,应重复测试。如果变化,偏差应在报告中表示。温度观测系统的重要组成部分,也应记录下来。
第二个1小时的测试应在电源起飞功率水平和最低的发动机速度,这将保持这种权力,在额定功率起飞速度。
第三个系列的测试将确定在部分负载的功率起飞功率的调速器设置为第二个测试。每次试验应持续至少20分钟,并应按照4.1.1以上。
在皮带或皮带轮轴的性能
试验要求。
拖拉机皮带轮应通过皮带连接到测功机板凳。这一带应是灵活的,并有适当的功率和扭矩传输特性。皮带打滑,不得超过2%,必要的张力,得到此条件下,应尽可能的小。
更多追问追答
追问
我还有一段 愿意帮忙再翻译吗?
追答
希望给与最佳答案 谢谢
这些测试必须在温度调节到= 2。拖拉机连接到测力计板凳,在电源测试。
处的空气温度在测试过程中,在以下温度采取:水温在恒温器的缸体之前,或在一个空气冷却的发动机的情况下,温度在由引擎制造者制备点持有的温度传感装置; coooling系统入口;发动机油温度,在空气净化器入口的空气温度;燃料温度。
测试程序
发生的最大功率在额定发动机转速的调速器控制杆组的第一个系列的测试。