麻烦哪位高人帮忙将以下简历翻译成英文 不胜感激

职位:项目协调员简述:协助项目经理跟进新项目从设计、开发、生产到出货全过程,包括项目开发时间进度管理、项目开发成本管理、产品开发过程控制和监控、追踪产品开发质量等;处理期... 职位:项目协调员
简述:协助项目经理跟进新项目从设计、开发、生产到出货全过程, 包括项目开发时间进度管理、项目开发成本管理、产品开发过程控制和监控、追踪产品开发质量等; 处理期间各类问题,制作所须文件,在客户与工厂之间搭建沟通的桥梁,确保样品满足设计理念,保证产品如期出货。
展开
 我来答
西西厂
2009-05-29 · 超过18用户采纳过TA的回答
知道答主
回答量:65
采纳率:0%
帮助的人:0
展开全部
To assist the project manager to follow up the new project from the design, development, production to shipping the entire process, including project development schedule management, project development cost management, product development, process control and monitoring, to track the quality of product development; dealing with various issues during the period, required for the production of documents between the client and the factories to build a bridge to ensure that the samples meet the design to ensure that products shipped on schedule.

这是机器翻译,会有错误!但是大体差不多,你还得需要去改正
匿名用户
2009-05-29
展开全部
职位:项目协调员
Position: Project coordinator

简述:协助项目经理跟进新项目从设计、开发、生产到出货全过程, 包括项目开发时间进度管理、项目开发成本管理、产品开发过程控制和监控、追踪产品开发质量等; 处理期间各类问题,制作所须文件,在客户与工厂之间搭建沟通的桥梁,确保样品满足设计理念,保证产品如期出货。
Summary: Assistance project manager follows up the new project from the design, the development, to produce to produces goods the entire process, including project development time schedule management, project development cost management, product development process control and monitoring, tracing product development quality and so on; Processing period each kind of question, manufactures must the document, builds the communication between the customer and the factory the bridge, guaranteed that the sample satisfies the design idea, guaranteed that the product produces goods as scheduled.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
飞翔的燕D584a
2009-05-29 · TA获得超过2270个赞
知道小有建树答主
回答量:640
采纳率:0%
帮助的人:417万
展开全部
Position: project coordinator
Description: a project manager, assist follow new projects from the design, development and production process, including delivery to the project schedule management, project cost management, product development process control and monitoring, and track quality product development, etc. During the treatment, making all kinds of problems, must file in communication between clients and factories, ensure sample products meet the design concept, delivery schedule.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
power2112
2009-05-29 · TA获得超过113个赞
知道答主
回答量:71
采纳率:0%
帮助的人:40.7万
展开全部
Title: Project Coordinator
Brief: to assist the project manager to follow up the new project from the design, development, production to shipping the entire process, including project development schedule management, project development cost management, product development, process control and monitoring, to track the quality of product development; deal with during the issues, the production of the necessary documents between the client and the factories to build a bridge to ensure that the samples meet the design to ensure that products shipped on schedule.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
收起 更多回答(2)
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式