还是翻译 帮个忙!

1PACKING:Stockreadyforcontainer(Seephotosforpalletizedstacking)2TARGETPRICE:USD$23.50... 1 PACKING: Stock ready for container (See photos for palletized stacking)
2 TARGET PRICE: USD $ 23.50 (USD) EX/Yard and $ 33.50 to $ 35.50 FOB
3 DESTINATION: FOB (FOB Origin, Above Addresses – Easily trucked to port by third party at buyer expense)
DELIVERY: –Deliveries are 80,000 US pounds first shipment. Subsequent shipment schedule TBD a total of eight additional lots of 90,000 pounds will be made available in 2011 at the same price. An Option for one million additional pounds could be entertained for 2012 at a one dollar increase, per pound, over the 2011 pricing – commitment would have to be made formally by June 2011.
4 PAYMENT: Payment- The contract shall be secured by a BG or SBLC for a value of one month shipment amount for the contract duration plus 30 days monthly payment by LC. Seller will include certain penalty and liability clauses for default in the FCO. Once material is presented for shipment, buyer will have seven days to accept and release payment – upon receipt of full payment to the seller, material will be released for transport to port. 100% TT wired against weight of ticket also accepted.
5. INSPECTION:
9.1 The buyer has the right to inspect the material at the stocking area. All mill certificates are available and shall be assigned to the buyer at the time of loading. Further, buyer has the right to inspection by SGS at buyer’s expense. Buyer will have seven days from availability to complete inspection or to waive inspection and accept material.
9.2 The Inspection Agency may inspect the Commodity and issue Certificates to certify that the Commodity inspected are meeting the Quantity (+/-5% allow) and Quality requirement of the Contract. Any weight deviations will be credited to the buyer or seller respectively.
6. PROCEDURES:
vi. The Seller reviews and confirms any changes made in draft contract by the Buyer. If the Seller agrees to the changes made by Buyer, the Seller issues the final binding contract via fax or email.
vii. The Buyer returns the final agreed contract duly signed and sealed via email or fax.
viii. The buyers open a Non operative financial payment instrument.
The buyer shall take possession of the first lot of material within 30 days of the execution of the contract or the seller may have the right to declare the contract null & void.
展开
秋幂爽曦
2011-05-10 · TA获得超过328个赞
知道答主
回答量:44
采纳率:0%
帮助的人:17.5万
展开全部
1包装:股票准备的容器(见图片为托盘堆垛)
2美元的目标价格:23.50(美元)33.50院子和es 35.50美元美元,FOB
目的:FOB(离岸价3以上地址-轻易起源,卡车运送到港由第三方应由买方承担费用)
交货日期:我们是-Deliveries 80,000英镑的第一批货。随后的到货时间表未定一共有8额外的大量将会有9万英镑的价格相同,在2011年。另外一个选择了1百万英镑可加以为2012年增加,在在一美元,在2011年每磅定价——承诺必须变得形式上由2011年6月。
付款条件:付款- 4所担保合同应当SBLC为BG或一个月”的价值装运合同到期金额加上30天的月度付款的信用证。卖方将包括一定的点球和责任条款为默认值在公司公章。一旦资料基础上,给出了装船,买方将有7天的时间考虑是否接受并释放报酬,在收到全额付款给卖方,资料将被释放,运到港口。100%重量的票对TT有线也接受了。
5。检验:
9.1,买方有权检查资料在仓储区域。所有磨证书都是可行的,应当指派给买方装载时,。进一步,买方有权检查,由SGS机构在的费用应由买方承担。买方将有7天的时间来完成从可用性检查或免除检查并接受材料。
检验机构不得为9.2矩考察商品,核发证书,确认这商品检验是会议数量(+ / -)和质量超出允许合同规定的要求。任何重量偏差会记入买方或卖方的分别。
6。程序:
vi。 评审和确认卖方在合同草案修改将由买方承担。如果卖方同意对变化的由买方,卖方开具最后有约束力的合同以传真或电子邮件。
七世。T
语言桥
2024-02-28 广告
想要选择专业靠谱的翻译公司,可以关注一下国内综合实力比较强的翻译公司,一般来说这类型翻译公司经验会比较丰富。目前国内暂时还没有像这种翻译公司排名,但美国有一个机构CSA每年都会出一份翻译公司排名的榜单,国内也是有几家翻译公司上榜的。这里面语... 点击进入详情页
本回答由语言桥提供
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式