红池隧道为滨绥线牡丹江至绥芬河段铁路隧道扩能改造工程,本设计中隧道进出口均采用帽檐斜切式洞门,以达到美观要求。本隧道采用新奥法施工方法,衬砌结构均采用复合式衬砌。Ⅲ~Ⅴ级... 红池隧道为滨绥线牡丹江至绥芬河段铁路隧道扩能改造工程,本设计中隧道进出口均采用帽檐斜切式洞门,以达到美观要求。本隧道采用新奥法施工方法,衬砌结构均采用复合式衬砌。Ⅲ~Ⅴ级围岩隧道均采用曲墙带仰拱衬砌结构形式,洞口段采用明洞开挖,进行超前支护及整体衬砌。隧道通风采用压入式通风。排水设计采取“防、排、截、堵结合,因地制宜,综合治理”的原则;在富水地段且对水环境有严格要求的地段,采取“以堵为主,限量排放”原则。根据需要本隧道设置了一座斜井作为辅助坑道。隧道内设固定式照明设施,加设应急照明,专用洞室设置固定照明。施工方面,开挖采用光面爆破,严格控制超欠挖,初期支护喷混凝土采用湿喷工艺,并进行科学施工管理。
关键词:复合式衬砌;通风;照明;光面爆破
展开
 我来答
冷无蕊
2011-05-14 · TA获得超过109个赞
知道答主
回答量:151
采纳率:0%
帮助的人:72万
展开全部
Red Sea Sui Chi tunnels to Suifenhe section of the rail tunnel Mudanjiang expansion and reconstruction project, the design of tunnel-type import and export are used hat oblique Portal to meet the aesthetic requirements. The New Austrian Tunnel construction methods, lining are made of composite lining.Ⅲ ~ Ⅴ grade wall rock songs are used with the tunnel invert lining structure, Entrance by Myeong excavation, to advance support and overall lining. Tunnel ventilation with forced ventilation. Drainage design to take "anti-, row, section, block combined with local conditions in a comprehensive" principle; in the water-rich location and there are strict requirements on the water environment of the lot, take the "block-based, limited emissions"Principle. In accordance need to set up an inclined shaft of the tunnel as an auxiliary tunnel. Tunnel equipped with fixed lighting, additional emergency lighting, special chamber set to a fixed lighting. The construction, excavation by blasting, over and under strict control digging, shotcrete initial support wet spray process and carry out scientific construction management.
Key words: composite lining; ventilation; lighting; smooth blasting
C城烟火Angel
2011-05-14
知道答主
回答量:28
采纳率:100%
帮助的人:14.8万
展开全部
Red pool tunnel suijiang line shore section railroad tunnel to 2000, mudanjiang, this design engineering revamping/import and export all USES tunnels DongMen crosswise type hats, in order to achieve beautiful and requirements. This tunnel adopted new Austrian tunneling method method, lining structure adopts composite linings. Ⅲ ~ Ⅴ level rock tunnel adopts curved wall lining structure form with arch supine by Ming hole hole section, excavation, advanced supporting and overall lining. Tunnel ventilation using pressure into type ventilation. Drainage design take "anti, platoon, cut, plugging union, adjust measures to local conditions, the comprehensive management" principle; In the watery section of water environment and strict requirements on the location, take "mainly limited emission, blocking principle. According to need this tunnel set up a slope as auxiliary tunnel. Tunnel with fixed ?
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
柠染gc
2011-05-14
知道答主
回答量:23
采纳率:0%
帮助的人:3.5万
展开全部
Red Sea Sui Chi tunnels to Suifenhe section of the rail tunnel Mudanjiang expansion and reconstruction project, the design of tunnel-type import and export are used hat oblique Portal to meet the aesthetic requirements. The New Austrian Tunnel construction methods, lining are made of composite lining.Ⅲ ~ Ⅴ grade wall rock songs are used with the tunnel invert lining structure, Entrance by Myeong excavation, to advance support and overall lining. Tunnel ventilation with forced ventilation. Drainage design to take "anti-, row, section, block combined with local conditions in a comprehensive" principle; in the water-rich location and there are strict requirements on the water environment of the lot, take the "block-based, limited emissions"Principle. In accordance need to set up an inclined shaft of the tunnel as an auxiliary tunnel. Tunnel equipped with fixed lighting, additional emergency lighting, special chamber set to a fixed lighting. The construction, excavation by blasting, over and under strict control digging, shotcrete initial support wet spray process and carry out scientific construction management.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
集锦123
2011-05-14
知道答主
回答量:19
采纳率:0%
帮助的人:0
展开全部
Red Sea Sui Chi tunnels to Suifenhe section of the rail tunnel Mudanjiang expansion and reconstruction project, the design of tunnel-type import and export are used hat oblique Portal to meet the aesthetic requirements. The New Austrian Tunnel construction methods, lining are made of composite lining. Ⅲ ~ Ⅴ grade wall rock songs are used with the tunnel invert lining structure, Entrance by Myeong excavation, to advance support and overall lining. Tunnel ventilation with forced ventilation. Drainage design to take "anti-, row, section, block combined with local conditions in a comprehensive" principle; in the water-rich location and there are strict requirements on the water environment of the lot, take the "block-based, limited emission" principle. According to a need to set up the tunnel as an auxiliary shaft tunnel. Fixed inside the tunnel lighting, additional emergency lighting, special chamber set a fixed lighting. The construction, excavation by blasting, excavation of over and under strict control, initial support shotcrete wet spray process and carry out scientific construction management.
Key words: composite lining; ventilation; lighting; smooth blasting
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
收起 更多回答(2)
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式