IV.GeneralConditions:1.TheOwnerhastherighttocancelArchitecturalServicesatanytimeforca... IV. General Conditions:
1. The Owner has the right to cancel Architectural Services at any time for cause or for the Owner's convenience and will be responsible only for payment for services performed up to the date of cancellation. Any cancellation of Architectural Services shall be done in writing.
2. If the Owner fails to make payment on any undisputed amount, then the Architect has the right to suspend work and shall not be held responsible for any delays as a result.
3. If any dispute arises out of or relates to this contract, or breach thereof, and if said dispute cannot be settled through direct discussions, the parties agree to first endeavor to settle the dispute in an amicable manner by mediation before having recourse to a judicial forum. No written or oral representation made during the course of any mediation shall be deemed a party admission.
4. Changes in scope requested by the Owner that are inconsistent with Owner's prior approval of the Final Design Drawings, may result in additional work and shall be considered beyond the scope of this Agreement. The Architect will notify the Owner, prior to commencement of the additional services, of any time delays and additional fees that may be incurred.
5. It is suggested that General Contractors be invited to review design drawings in order to provide the Owner with preliminary estimates. The budget for the project as established by the Owner does not include items purchased separately by the Owner, such as cabinets, appliances, decorative light fixtures, specialty items, etc. The Owner is responsible for considering cost allowances for such additional items.
6. The Architect will make every effort to work within the design budget as set forth by the Owner. The Architect cannot be held responsible for significant changes for labor and material costs in the construction market.
7. The Architect shall have no responsibility for the identification, discovery, presence, handling, removal or disposal of, or exposure of persons to, hazardous materials in any form at the project site.
8. It is hoped that the services provided by the Architect be respected by both the Owner and the General Contactor. The Architect shall be notified of any proposed divergence from the intent of the work inferable from the Final Construction Documents and the actual work to be performed by the General Contractor. Prior to the execution of the work, the Architect shall approve any changes made to the Architectural design. The Architect's decision, in consultation with the owner, on aesthetic issues arising between the Architect and the General Contractor shall be final if consistent with the intent expressed in the Contract Documents.
展开
 我来答
MichelVvv
2011-08-11 · TA获得超过172个赞
知道答主
回答量:108
采纳率:0%
帮助的人:107万
展开全部
一般条件:
1.业主有权取消建筑服务在任何时间,以引起或业主的方便,只要负责支付服务的日期进行消除。取消建筑服务的,应当以书面形式完成。

2.发包人支付金额,然后在任何无可争议的建筑师有权暂停工作,不承担任何责任延迟的结果。

3.如果有争议的或与本合同违约,或者,如果说通过协商解决纠纷不能直接磋商,双方同意第一次努力解决争议调解结案的态度,在未诉诸司法论坛。没有书面或口头表述均期间的任何调解应被视为一个聚会入场。

4.在要求的变化范围的业主与业主一致的事先批准最终的设计图纸,可能会导致额外的工作,应被认为超出了本协议的范围。建筑师将通知业主,开工前的附加服务,没有任何时间延迟和额外费用可能会产生。

5.建议总承包被邀请参加审查设计图纸,目的是为了提供所有者与初步估计。项目预算制定由业主不包括由业主单独购买物品,比如橱柜、电器、装饰的灯光装置、专业的物品等。业主负责考虑额外费用津贴项目。

6.建筑师将尽一切努力在设计的财政预算案所提出的主人。建筑师不负责的显著变化对劳动和材料成本在建筑市场的健康发展。

7.建筑师将没有责任鉴定,发现,存在,处理,去除或处分,或接触的人、有害物质在任何形式在工程项目的工地。

8.希望所提供的服务被尊重的建筑师项目业主和一般接触器。建筑师应通知的任何建议的意图发散现象从最终的建设工作inferable文件和实际工作要由工程总承包。在执行工作,建筑师应批准的任何更改,建筑设计。建筑师的决定,在咨询与业主、美学问题之间产生的建筑师和工程总承包是终局的意图表示如果符合合同文件。

啊~~~终于搞定了
请采纳~~~~~~~~~~~~~
暗夜的紫玫瑰
2011-08-11 · TA获得超过133个赞
知道答主
回答量:47
采纳率:0%
帮助的人:25.3万
展开全部
IV. General Conditions:
四。一般条件:
1. The Owner has the right to cancel Architectural Services at any time for cause or for the Owner's convenience and will be responsible only for payment for services performed up to the date of cancellation. Any cancellation of Architectural Services shall be done in writing.
1。业主有权取消建筑服务随时为原因或业主的方便,将只负责支付服务直至取消日期。任何取消建筑服务应以书面。
2. If the Owner fails to make payment on any undisputed amount, then the Architect has the right to suspend work and shall not be held responsible for any delays as a result.
2。如果业主未能支付任何无可争议的金额,然后建筑师有权暂停工作和不负责任何延误,因此。
3. If any dispute arises out of or relates to this contract, or breach thereof, and if said dispute cannot be settled through direct discussions, the parties agree to first endeavor to settle the dispute in an amicable manner by mediation before having recourse to a judicial forum. No written or oral representation made during the course of any mediation shall be deemed a party admission.
3。如有任何争议产生的或涉及本合同的违约,或者,如果说争议未能解决直接讨论,双方同意第一次努力解决争端以和平的方式调解前求助于司法论坛。没有书面或口头陈述的过程中任何调解应被视为门票。
4. Changes in scope requested by the Owner that are inconsistent with Owner's prior approval of the Final Design Drawings, may result in additional work and shall be considered beyond the scope of this Agreement. The Architect will notify the Owner, prior to commencement of the additional services, of any time delays and additional fees that may be incurred.
4。变化范围由业主要求不一致的,以业主的事先批准的最终设计图纸,可能导致更多的工作,应考虑范围以外的本协议。建筑师会通知业主,开始之前的附加服务,任何时间延误和额外费用可能招致。
5. It is suggested that General Contractors be invited to review design drawings in order to provide the Owner with preliminary estimates. The budget for the project as established by the Owner does not include items purchased separately by the Owner, such as cabinets, appliances, decorative light fixtures, specialty items, etc. The Owner is responsible for considering cost allowances for such additional items.
5。有人建议,总承包商邀请审查设计图纸,为业主提供初步估计。预算项目所确立的业主不包括单独购买的业主,如橱柜,电器,装饰灯具,专业的项目,等负责人考虑成本津贴等项目。
6. The Architect will make every effort to work within the design budget as set forth by the Owner. The Architect cannot be held responsible for significant changes for labor and material costs in the construction market.
6。建筑师将尽一切努力工作,在设计预算规定由业主。建筑师无法举行负责重大变化的劳动力和材料成本在建筑市场。
7. The Architect shall have no responsibility for the identification, discovery, presence, handling, removal or disposal of, or exposure of persons to, hazardous materials in any form at the project site.
7。建筑师将没有责任的鉴定,发现,存在,处理,清除或处置,或暴露者,危险材料以任何形式在项目现场。
8. It is hoped that the services provided by the Architect be respected by both the Owner and the General Contactor. The Architect shall be notified of any proposed divergence from the intent of the work inferable from the Final Construction Documents and the actual work to be performed by the General Contractor. Prior to the execution of the work, the Architect shall approve any changes made to the Architectural design. The Architect's decision, in consultation with the owner, on aesthetic issues arising between the Architect and the General Contractor shall be final if consistent with the intent expressed in the Contract Documents.
8。这是希望提供的服务由建筑师的尊重,无论是业主和一般接触器。建筑师应通知提出的任何分歧的工作的意图推理的最后施工文件和实际工作是由总承包商。之前执行工作,建筑师应批准任何变化的建筑设计。建筑师的决定,在与业主,审美所引起的问题之间的建筑师和承包商应最终如果符合的意图表示在合同文件。
好了吧?妈的,我眼睛也酸死了。不为别的,只为。。。。。。。多加加钱!
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
xc_nancy
2011-08-11 · TA获得超过305个赞
知道小有建树答主
回答量:333
采纳率:0%
帮助的人:97.7万
展开全部
在横线上。一般条件:
1。业主有权取消建筑服务在任何时间,以引起或业主的方便,只要负责支付服务的日期进行消除。取消建筑服务的,应当以书面形式完成。
2。发包人支付金额,然后在任何无可争议的建筑师有权暂停工作,不承担任何责任延迟的结果。
3。如果有争议的或与本合同违约,或者,如果说通过协商解决纠纷不能直接磋商,双方同意第一次努力解决争议调解结案的态度,在未诉诸司法论坛。没有书面或口头表述均期间的任何调解应被视为一个聚会入场。
4。在要求的变化范围的业主与业主一致的事先批准最终的设计图纸,可能会导致额外的工作,应被认为超出了本协议的范围。建筑师将通知业主,开工前的附加服务,没有任何时间延迟和额外费用可能会产生。
5。建议总承包被邀请参加审查设计图纸,目的是为了提供所有者与初步估计。项目预算制定由业主不包括由业主单独购买物品,比如橱柜、电器、装饰的灯光装置、专业的物品等。业主负责考虑额外费用津贴项目。
6。建筑师将尽一切努力在设计的财政预算案所提出的主人。建筑师不负责的显著变化对劳动和材料成本在建筑市场的健康发展。
7。建筑师将没有责任鉴定,发现,存在,处理,去除或处置
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
收起 更多回答(1)
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式