求专业英文翻译 如下: 20

1.新产品导入(人员配置、制程优化、设备申购与布置、产能安排、试产成本管控);SOP及flowchart制作;2.工时E化,工时系统更新与维护;3.评估制造成本,标准工时... 1.新产品导入(人员配置、制程优化、设备申购与布置、产能安排、试产成本管控); SOP及flowchart制作;

2.工时E化,工时系统更新与维护;

3.评估制造成本,标准工时数据库的制定、评估及改进,减少资源浪费;

4.协助生产线解决问题,降低生产干扰因素;

5.用工程分析,作业分析等实现制程合理化和生产线最佳化;

6.作业效率分析与改善,人机作业配合效率分析与改善,从SMT到点、贴、冲及装配线 进行参数优化、动作优化和制程优化,提升产线平衡;

7.生产线各种产品的产能评估、改善及成本控制;

8.生产线设备的综合利用率的分析及生产线平衡改善,提升产线PPH(人均时产能);

9.BOM、MC Plan、Routing系统导入及维护;

10.协调计划、生产部门间关于设备、人员最大产能分析及出货周期的评估与预定;
展开
 我来答
昨夜纷飞
2013-04-16 · TA获得超过121个赞
知道答主
回答量:51
采纳率:100%
帮助的人:9.4万
展开全部
1 new product introduction (personnel allocation,process optimization, equipment purchase and arrangement, capacity management,production cost control); SOP and Flo wchart; 2 hours of E,the updating and maintenance man-hour system; 3 assess the manufacturing cost,standard working hours and improve the formulation,evaluation database,reduce the waste of resources; 4 to assist the production line to solve problems,reduce the production of interference factors; 5 engineering analysis,work analysis, implementation process rationalization and production line optimization; 6 operating efficiency analysis and improvement,man-machine operation analysis and improvement of efficiency, from the SMT point,paste,drawing and assembly line optimization,operation optimization and process optimization, improve production line balancing; Capacity evaluation,improvement and cost control of 7 production lines of various products; Comprehensive utilization of 8 production line equipment analysis and production line rate balance improvement,improve production line PPH (per capita capacity); And maintenance of 9.BOM,MC Plan, Routing system implementation; 10 coordinate planning,production department of equipment,personnel maximum yield analysis and evaluation and scheduled delivery cycle.
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
ztlthb
2013-04-16 · TA获得超过1.1万个赞
知道大有可为答主
回答量:6514
采纳率:0%
帮助的人:1725万
展开全部
1. New product introduction (staffing, process optimization, equipment
purchasing and organization of features, capacity, production cost
control);SOP and flowchart completion;

2. E-work, the update and maintenance of the work manage system;

3.Evaluation of manufacturing cost, standard work, database development,
assessment, and improvement of, and reduce the waste of resources;

4. Help line solve the problem, reduce the interference factors of production;

5. Engineering analysis, job analysis to achieve rationalization of processes and production
line optimization;

6.Analysis and improvement of efficiency, human-machine job matching
efficiency analysis and improvement, from SMT to point up, punching and
assembly line optimization, optimization and process optimization,
upgrading production line balancing;

7. Production line capacity assessment, improvement and cost control of various products;

8.Production line of analysis on the comprehensive utilization of
equipment and balancing improvements, enhance production-line PPH
(capacity when per capita);

9.BOM, MC import Plan, Routing systems, and maintenance;

10.Coordination of plans and production departments on the maximum
productivity analysis equipment, personnel and ship cycle of assessment and booking;
本回答被网友采纳
已赞过 已踩过<
你对这个回答的评价是?
评论 收起
推荐律师服务: 若未解决您的问题,请您详细描述您的问题,通过百度律临进行免费专业咨询

为你推荐:

下载百度知道APP,抢鲜体验
使用百度知道APP,立即抢鲜体验。你的手机镜头里或许有别人想知道的答案。
扫描二维码下载
×

类别

我们会通过消息、邮箱等方式尽快将举报结果通知您。

说明

0/200

提交
取消

辅 助

模 式